Tender Details
Particulars | Details |
---|---|
Title |
P/F Glass Partition Work At Library
|
Description |
Providing And Fixing Glass 
Partition With Ss Pipe 
Framework At Dr. A.P.J. 
Abdul Kalam, Digital 
Library Mgims/Khs, 
Sevagram.
|
Organisation | Mahatma Gandhi Institute of Medical Sciences | Central Govt. Ministry/Department |
Tender Id | 2025_MGIMS_843091_1 |
Reference Number |
e-Tender/2024-25/EMD/14 |
Tender Fee | 590 |
EMD | 5000 |
Tender Value | |
Place | KHS sewagram |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=886220 |
Start Date | January 07, 2025 22:30 |
End Date |
20/01/2025 ( Expired 93 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
AAAAAAAAAA
Login to viewBalance work of widening improvement to 2 lane lane with paved shoulder from km 27.150 to km 47.682 on dibrugarh to ledo section with proposed margherita and ledo bypass of nh 38 in tinsukia
Read moreDamaged door
Work for rr of old damaged doors and s in officer and sub ordinate rest house and rr of 2 no toilets in control room at 220kv gss bbmb jagadhari
Read moreProvision of deficient faclities near bldg no p-80 and p-81 at sma varunapuri and replacement of damaged wire mesh and concertina coil on perimeter wall of nuwr goa under ge(nw) vasco
Provision of deficient faclities near bldg no p-80 and p-81 at sma varunapuri and replacement of damaged wire mesh and concertina coil on perimeter wall of nuwr goa under ge(nw) vasco
Read moreDesign and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode
Design and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode
Read moreDesign and engineering, supply, installation, testing and commissioning of 100 kw ground mounted solar pv generation system without battery, at hq ce (p) chetak, bichhwal, bikaner in the state of rajasthan
Design and engineering, supply, installation, testing and commissioning of 100 kw ground mounted solar pv generation system without battery, at hq ce (p) chetak, bichhwal, bikaner in the state of rajasthan
Read moreOutsourcing maintennace at ph-1 to ph-4 of mukerian hydel project pspcl talwara punjab
Outsourcing the work of routine, prive maintenance, breakdown maintenance and annual overhauling of generating units, switchyards and other allied equipment through contractor at ph 1 to 4 of mukerian hydel project pspcl talwara pb
Read moreSlope stabilisation of banks of indus river at nimu military station under station hq nimu for a length of 236.00m under 81 rcc/ 16 brtf (p) vijayak in ladakh (ut) on epc mode
Slope stabilisation of banks of indus river at nimu military station under station hq nimu for a length of 236.00m under 81 rcc/ 16 brtf (p) vijayak in ladakh (ut) on epc mode
Read moreConstruction of boundary wall and fencing work at kile ke piche ward no. 11, vijayraghavgad, katni
Construction of boundary wall and fencing work at kile ke piche ward no. 11, vijayraghavgad, katni
Read moreConstruction work of additional floor at vishnupura community hall in ward no. 37
Construction work of additional floor at vishnupura community hall in ward no. 37
Read moreof your Industry type