Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of The Distressed Old Protection Walls On Canal Bed On Right Side Between Rd 6.300km To 6.500km Of Anta Distributary.
|
| Description |
Canal Maintenance
|
| Organisation | CE AND BM IK BASIN BARINIPUT JEYPORE | State Govt. and UT |
| Tender Id | 2026_UKHWK_129001_1 |
|
Reference Number |
SE-UKHWD-02-2026-27(Sl.No.02) |
| Tender Fee | 6000 |
| EMD | 10700 |
| Tender Value | |
| Place | JEYPORE |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=590271 |
| Start Date | May 08, 2026 17:30 |
| End Date |
Expired
18/05/2026
Expired 36 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Relining of damaged portion of lining of new kiloi minor from rd 800 to 870 right side
Relining of damaged portion of lining of new kiloi minor from rd 800 to 870 right side
Read moreConstruction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Read moreRepairing of rear wheel hub both sides, repairing of front right side suspension sup-port, replacement of left side hoist cylinder, and removing the anchor pin, worn out bush and repairing of anchor pin housing and fitment of anchor bushing and pin.
Repairing of rear wheel hub both sides, repairing of front right side suspension sup-port, replacement of left side hoist cylinder, and removing the anchor pin, worn out bush and repairing of anchor pin housing and fitment of anchor bushing and pin.
Read moreReplacement of false ceiling of 2nd floor, repair of fallen tiles area of walls of classrooms with plaster provision of irc jali at gap between false ceiling and gi sheet at the 2nd floor of old building at govt. sv sector 3 rohini delhi110085 school
Replacement of false ceiling of 2nd floor, repair of fallen tiles area of walls of classrooms with plaster provision of irc jali at gap between false ceiling and gi sheet at the 2nd floor of old building at govt. sv sector 3 rohini delhi110085 school
Read moreGeneral-monsoon preparedness 2026- puthukudi thodu-temporary side protection works to house no. 464 in ward no. 5 on d/s side of puthukudi culvert at puthukudi in keezhallur panchayath in mattannur constituency, kannur district-general civil work-1
General-monsoon preparedness 2026- puthukudi thodu-temporary side protection works to house no. 464 in ward no. 5 on d/s side of puthukudi culvert at puthukudi in keezhallur panchayath in mattannur constituency, kannur district-general civil work-1
Read moreHyderabad division: sw(i) sc-mue section: proposed construction of 2 lane rob in lieu of lc no.180 at rly km 422/1-2 of span 1x36.00 m composite girder between dab-bsx stations on mue-sc section of hyb division - deposit work sw(ii) hyb div: sc-mue section: proposed construction of 2 lane rob at rly km 418/0-1 of span 1x36.00 m composite girder between kek- dab stations on mue-sc section on sh/mdr at km 1002.9 at atkur side road bypass near dharmabad-deposit work. - electrical trd arrang
For complete deion and other details, please refer to tender
Read moreComplete repairing/rewinding of 03 numbers of 10hp,550v,3phase,2900rpm submersible pump motors for ensuring smooth water supply to the residential quarters and boiler reservoir from riverside borehole, old 7 no. pit and water reservoir at madhaipur
Complete repairing/rewinding of 03 numbers of 10hp,550v,3phase,2900rpm submersible pump motors for ensuring smooth water supply to the residential quarters and boiler reservoir from riverside borehole, old 7 no. pit and water reservoir at madhaipur
Read moreConstruction of right-side guard wall with bed lining in between rd 806m to rd 943m of tope distributary for the year 2026-27
Construction of right-side guard wall with bed lining in between rd 806m to rd 943m of tope distributary for the year 2026-27
Read moreConstruction of right-side guard wall with bed lining in between rd 1800m to rd 1977m of lastala distributary for the year 2026-27
Construction of right-side guard wall with bed lining in between rd 1800m to rd 1977m of lastala distributary for the year 2026-27
Read moreConstruction of right-side guard wall with bed lining in between rd 2458m to 2687m, rd 2750m to 2760m and both side guard wall with bed lining in-between rd 2740m to rd 2750m of bugbuga distributary for the year 2026-27
Construction of right-side guard wall with bed lining in between rd 2458m to 2687m, rd 2750m to 2760m and both side guard wall with bed lining in-between rd 2740m to rd 2750m of bugbuga distributary for the year 2026-27
Read moreof your Industry type