Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Supply Of Ballast And Stacking Services 🛤️ The Ministry Of Railways, Central Government, Invites Bids From Reputable Suppliers For The Supply Of Ballast And Stacking Services In The Bmck Rgda Section As Part Of The 3rd Line Works For The East Coast Railway (E Co R), Sambalpur/Vishakhapatnam Divisions, Odisha State. 📅 Bid Submission Deadline: July 01, 2024, 3:00 Pm A Tender Fee Of Inr 19909 Is To Be Paid For The Bid Document. Interested Suppliers Must Review The Complete Tender Document For Detailed Specifications, Terms, And Conditions. Keywords: Ballast Supply, Stacking Services, Railway Project, Ministry Of Railways, E Co R, Tender, Government Procurement, Odisha State| Particulars | Details |
|---|---|
| Title |
Supply Of Ballast And Stacking In Between Bmck Rgda Section In Connection With 3rd Line Works From Tig Vzm, E.Co.Rly Of Sambalpur/Waltair Divisions, Odisha State
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75291208 |
|
Reference Number |
BALLAST_BMCK-RGDA |
| Tender Fee | 0 |
| EMD | 19.91 Lakh |
| Tender Value | - |
| Place | New Delhi |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75291208/viewNitPdf_4581901.pdf |
| Start Date | May 25, 2024 21:16 |
| End Date |
Expired
01/07/2024
Expired 834 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of dilapidated existing lt cubical of electrical(g) sub-stations at vskp, vzm, che, rgda, krpu, jdb, krdl, lkmr, ark, sup to improve power supply system over waltair division (phase-i)
For complete deion and other details, please refer to tender
Read moreReplacement of lead acid cell capacity: 2v - 300ah, 2v - 200 ah and 2v - 80ah batteries installed in the sections of sse/sig/rgda, sse/sig/vzm and sse/sig/sup of waltair division.
For complete deion and other details, please refer to tender
Read moreMiscellaneous contract for electrical general works of kr line (dmrt to ktga ) & rv line(sprd to gtlm) under the jurisdiction of sse/elg/krpu, lkmr, rgda, vzm in waltair division for 02 years
For complete deion and other details, please refer to tender
Read moreSupply, fabrication,erection and re-girdering of br no.624up, 655up, 784dn, 836up of r-v line with rdso/approved drawings to suit 25t axle load between rgda-vzm section of waltair division in view of mission 3000 mt ..
For complete deion and other details, please refer to tender
Read moreReplacement of lead acid cell capacity: 2v - 200 ah and 2v - 80 ah batteries, led s and defective cables and provision of elb s at interlocked lc gates over waltair division (in rv & main line under jurisdiction of sse/sig/rgda and sse/sig/vzm).
For complete deion and other details, please refer to tender
Read moreComprehensive annual maintenance contract for single line double faced at a glance display board (agdb), main data communication hub (mdch), platform data communication hub (pdch), ups 5 kva, led based coach guidance display board (cgdb) at vskp, vzm, rgda & che stations of waltair division for 02 (two) years.
For complete deion and other details, please refer to tender
Read moreComprehensive annual maintenance contract for single line double faced at a glance display board (agdb), main data communication hub (mdch), platform data communication hub (pdch), ups 5 kva, led based coach guidance display board (cgdb) at vskp, vzm, rgda & che stations of waltair division for 02 (two) years
For complete deion and other details, please refer to tender
Read moreComprehensive annual maintenance contract for single line double faced at a glance display board (agdb), main data communication hub (mdch), platform data communication hub (pdch), ups 5 kva, led based coach guidance display board (cgdb) at vskp, vzm, rgda & che stations of waltair division for 02 (two) years.
For complete deion and other details, please refer to tender
Read moreSupply and stacking of 60,000 cum machine crushed track ballast as per railways specification at jujomura depot from outside railway land/quarry and loading into railway s wagons under the jurisdiction of aden/sambalpur of sambalpur division (period of completion: 18 months excluding monsoon period).
For complete deion and other details, please refer to tender
Read moreSupply and stacking of 60,000 cum machine crushed track ballast as per railways specification at jujomura depot from outside railway land/quarry and loading into railway s wagons under the jurisdiction of aden/sambalpur of sambalpur division (period of completion: 18 months excluding monsoon period).
For complete deion and other details, please refer to tender
Read moreof your Industry type