Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Complete Boiler,Pipe Coiled,Blower,Magnetic Device,Charges
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/4511361 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 20, 2024 03:07 |
| End Date |
Expired
03/02/2024
Expired 988 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | HINDUSTAN REFRIGERATION SERVICE | - | 03-02-2024 08:17:26 | MSE | Qualified |
| 2 | M/S R K REFRIGERATION | - | 04-02-2024 12:14:31 | MSE | Qualified |
| 3 | V R & SONS | - | 03-02-2024 01:02:12 | MSE | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | M/S R K REFRIGERATION(MSE)( MSE Social Category:General ) | Item Categories : complete boiler,pipe coiled,blower,magnetic device,charges | 236354.00 | L1 |
| 2 | HINDUSTAN REFRIGERATION SERVICE( MSE Social Category:OBC ) | Item Categories : complete boiler,pipe coiled,blower,magnetic device,charges | 272130.00 | L2 |
| 3 | V R & SONS( MSE Social Category:OBC ) | Item Categories : complete boiler,pipe coiled,blower,magnetic device,charges | 282350.00 | L3 |
Cane cutter,fibrizer,boiler fd fan,boiler id fan,bagasilo blower,nk 1301 continuous machine,nk 1100 continuous machine,boiler no 3 spreyder
Cane cutter,fibrizer,boiler fd fan,boiler id fan,bagasilo blower,nk 1301 continuous machine,nk 1100 continuous machine,boiler no 3 spreyder
Read moreBlower assy, rm-100ac,complete assy, swam, rh-200ac
Blower assy, rm-100ac,complete assy, swam, rh-200ac
Read moreSm466140005-contact device complete for flow monitor
Sm466140005-contact device complete for flow monitor
Read moreProvn of fd heating device kero heater including all complete accessories,a provn of fd heating device kero heater including all complete accessories,b provn of fd heating device kero heater including all complete accessories,c provn of fd heating device kero heater including all complete accessories,d provn of fd heating device kero heater including all complete accessories,e provn of fd heating device kero heater including all complete accessories
Provn of fd heating device kero heater including all complete accessories,a provn of fd heating device kero heater including all complete accessories,b provn of fd heating device kero heater including all complete accessories,c provn of fd heating device kero heater including all complete accessories,d provn of fd heating device kero heater including all complete accessories,e provn of fd heating device kero heater including all complete accessories
Read moreNit/pom-100990 for supply of complete cartridge assemblyfor boiler feed pump(bfp)
For procurement of complete cartridge assembly for boiler feed pump(bfp) of 250mw, unit-7, ptps, panipat.
Read moreBmd-service charges for online testing and pressure setting of boiler safety valves of 1x500 mw ktpp unit
Bmd-service charges for online testing and pressure setting of boiler safety valves of 1x500 mw ktpp unit
Read moreComplete overhauling of fip of als including repair replacement of kit, s and labor charges,complete overhauling of fip of 2.5 ton including repair replacement of kit complete labor charges,complete ovehauling of mpv including repair replacement of kit complete piston and injectors assy incl labor charges,repair and replacement of pressure pipe lines of mpv,repair and replacement pf pressure pipe lines of als
Complete overhauling of fip of als including repair replacement of kit, s and labor charges,complete overhauling of fip of 2.5 ton including repair replacement of kit complete labor charges,complete ovehauling of mpv including repair replacement of kit complete piston and injectors assy incl labor charges,repair and replacement of pressure pipe lines of mpv,repair and replacement pf pressure pipe lines of als
Read moreRemoval of technological waste from boiler furnace seal area, cpp dry ash silo system area including compressor and panel room, seal air blower room and air compressor room of cpp boiler
Removal of technological waste from boiler furnace seal area, cpp dry ash silo system area including compressor and panel room, seal air blower room and air compressor room of cpp boiler
Read moreStud tensioner with pump complete for boiler circulation pump (max load cap 2000kg. per cm2, wor
Stud tensioner with pump complete for boiler circulation pump (max load cap 2000kg. per cm2, wor
Read moreof your Industry type