Tender Details

Particulars Details
Title
Construction Of Toilet Block At Kadambagachi Sardarpara Fp School Under Kadambagachi G.P
Description
Construction Of Toilet Block At Kadambagachi Sardarpara Fp School Under Kadambagachi G.P Under Barasat I Panchayat Samity
Organisation Government of West Bengal
Tender Id 2023_ZPHD_598708_1
Reference
Number
N24PG/Bst-I/PS/N-22(3RD CALL)/2023-2024
Tender Fee 0
EMD 5000
Tender Value
Place OFFICE OF THE BARASAT I PANCHAYAT SAMITY
Link
View Original Tender Notice

https://wbtenders.gov.in

Start Date November 03, 2023 23:30
End Date
Expired 09/11/2023

Expired 984 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of two wheeler parking behind post office haridwar under kumbh mela 2027.

Construction of two wheeler parking behind post office haridwar under kumbh mela 2027.

Read more
Construction of drainage at mgr nagar in narasingarayanpettai

Construction of drainage at mgr nagar in narasingarayanpettai

Read more
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2

Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&amp#x0d

Read more
Provision of arboriculture and associated work at certain location at af station arjan singh under ge p af panagarh

Provision of arboriculture and associated work at certain location at af station arjan singh under ge p af panagarh

Read more
Construction of intermediate pumping stations ips including pl of sewer network rising main and allied works at baramulla

Construction of intermediate pumping stations ips including pl of sewer network rising main and allied works at baramulla

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode

Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Extension and new construction of staffs quarter and compound wall for p. h. sub-centre at mouza mangi, tq.- pandharkawada, dist.- yavatmal

Extension and new construction of staffs quarter and compound wall for p. h. sub-centre at mouza mangi, tq.- pandharkawada, dist.- yavatmal

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise