| Title |
E4243017 For Pmu (Phasor Measurement Unit) For Ntpc Talcher
|
| Description |
|
| Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
| Tender Id | GEM/2024/R/427562 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | December 30, 2024 22:30 |
| End Date |
Expired
02/01/2025
Expired 631 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
DEVNAM PIYADASSI BRIXWELL PRIVATE LIMITEDVinayak EnterprisesDD ENTERPRISESOFFICE...
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| Crompton Briz Air Deco 1200mm Lustre Brown | crompton | Crompton Briz Air Deco 1200mm Lustre Brown | 12 | ₹ 28800.000 |
| NOTICE BOARD | NA | NA | 4 | ₹ 4600.000 |
| Samsung MLT-D203S Black Toner Cartridge | SAMSUNG | Samsung MLT-D203S Black Toner Cartridge | 60 | ₹ 333600.000 |
| file cover with printing | AU | file cover with printing | 300 | ₹ 3000.000 |
| SIMMTRONICS 2GB | Simmtronics | SIMMTRONICS 2GB DDR2 | 14 | ₹ 14000.000 |
| File Tag Green | Unbranded | File Tag Green-v18 | 372 | ₹ 49848.000 |
| Microsoft Officestd 2016 SNGL OLP C | Microsoft | Microsoft & Officestd 2016 SNGL OLP C | 1 | ₹ 14800.000 |
| Electrical Wire 4mm Bundle 90M | finolex | 4m-CU-AL | 6 | ₹ 37800.000 |
| SURF EXCEL EASY WASH | surf excel | SURF EXCEL BLUE | 15 | ₹ 1638.750 |
| MULTIMEDIA PROJECTOR | Hitachi | HITACHI CP-X2542WN | 1 | ₹ 37280.000 |
| hp desktop | hp | HP Slimline 270-p020il | 2 | ₹ 64798.000 |
| GODREJ COMPUTER TABKE C11 | GODREJ INTERIO | GODREJ COMPUTER TABKE C11 | 2 | ₹ 17560.000 |
| CDMA Trainer | Tatame | Tatame TTCDMATR | 1 | ₹ 49990.000 |
| MEDICAL REIMBURSEMENT CLAIM FORM | PARAS | PARAS MEDICAL REIMBURSEMENT CLAIM FORM | 10 | ₹ 950.000 |
| best and more reliable weighing scale | Omron | hn289 omron | 25 | ₹ 49999.750 |
| Carrier split AC | Carrier | CAS18DF3N8F0/2018 | 1 | ₹ 37850.000 |
| File wrapper or flap | NA | wrapper | 600 | ₹ 2580.000 |
| file cabinet four drawer (NV) | N.V. | NV-FC-001 | 1 | ₹ 8900.100 |
| HP 204A Cyan LaserJet Toner Cartridge CF511A | hp | HP 204A Cyan LaserJet Toner Cartridge CF511A | 2 | ₹ 6986.000 |
| HP 204A Yellow LaserJet Toner Cartridge CF512A | hp | HP 204A Yellow LaserJet Toner Cartridge CF512A | 2 | ₹ 6986.000 |
Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Read moreProviding 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreSupply, erection and commissioning of phasor measurement unit at ntpc solapur
Supply, erection and commissioning of phasor measurement unit at ntpc solapur
Read moreSupply, erection, and commissioning of phasor measurement unit at ntpc solapur
Supply, erection, and commissioning of phasor measurement unit at ntpc solapur
Read moreDesign, supply, installation, integration and commissioning and maintenance of remote terminal unit (rtu) and phasor measurement unit (pmu) including replacement of old and obsolete rtu
Design, supply, installation, integration and commissioning and maintenance of remote terminal unit (rtu) and phasor measurement unit (pmu) including replacement of old and obsolete rtu
Read moreSupply and installation of phasor measurement unit including supervision of erection, testing and commissioning and integration of pmu with existing pdc for 400kv substation sahupuri
Supply and installation of phasor measurement unit including supervision of erection, testing and commissioning and integration of pmu with existing pdc for 400kv substation sahupuri
Read moreof your Industry type