Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Day To Day Tower Shifting, Transformer Shifting And Switch Shifting For 3 Months In The Mines Of Peocp Under Hazaribagh Area
|
| Description |
Day To Day Tower Shifting, Transformer Shifting And Switch Shifting For 3 Months In The Mines Of Peocp Under Hazaribagh Area
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_289268_1 |
|
Reference Number |
PO/PEOCP/EnM/Tender/23-24/ 14 |
| Tender Fee | - |
| EMD | 2500 |
| Tender Value | - |
| Place | PEOCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | September 21, 2023 20:30 |
| End Date |
Expired
03/10/2023
Expired 1111 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling, shifting and erection of 20 nos high mast lighting tower
Dismantling, shifting and erection of 20 nos high mast lighting tower (20/30 mtrs height) in different location as per requirement of mines under kusmunda open cast project
Read moreArmo e&m services at ddb tower-b, mandi house, new delhi. (sh: supplying of led batten fittings and 2x2 slim led fittings for day to day maintenance at ddb tower b
Armo e&m services at ddb tower-b, mandi house, new delhi. (sh: supplying of led batten fittings and 2x2 slim led fittings for day to day maintenance at ddb tower b
Read moreMaintenance of bsnl staff qtrs. in all urban and rural area under gurgaon ssa sh- day to day maintenance for six months
Maintenance of bsnl staff qtrs. in all urban and rural area under gurgaon ssa sh- day to day maintenance for six months
Read moreAnnual maintenance contract of two tower wagons of bhavnagar division for 2 years (24 months)
Annual maintenance contract of two tower wagons of bhavnagar division for 2 years (24 months)
Read moreShifting of transformer and dg set at state cyber crime bldg phase-iv, sas nagar
Shifting of transformer and dg sets at state cyber crime building at phase-iv s.a.s. nagar
Read more(a) erection /dismantling of poles along with conductors and other associated accessories 3.3 kv o/h line (feeder 1, feeder 2 , feeder 3 and feeder 4), and installation of 11 kv grade goab switch, installation of lighting transformer, switch shifting
(a) erection /dismantling of poles along with conductors and other associated accessories 3.3 kv o/h line (feeder 1, feeder 2 , feeder 3 and feeder 4), and installation of 11 kv grade goab switch, installation of lighting transformer, switch shifting
Read moreShifting 11 kv line lt line for road widening work from rr tower to kati ghati distt.gwlior
Shifting 11 kv line lt line for road widening work from rr tower to kati ghati distt.gwlior
Read moreShifting of 11kv line and lt line and transformer at university junction to shobaghpura road. 4704
Shifting of 11kv line and lt line and transformer at university junction to shobaghpura road. 4704
Read moreProvision of s&t work in connection with shifting of ohe depot and tower wagon siding from dho to mra for better mobility of tower wagon/staff.
Provision of s&t work in connection with shifting of ohe depot and tower wagon siding from dho to mra for better mobility of tower wagon/staff.
Read moreStrengthening of hatod ajnod road length 13.05km. i/c shifting/heighting of existing 11kv line/33kv line and transformer etc.
Strengthening of hatod ajnod road length 13.05km. i/c shifting/heighting of existing 11kv line/33kv line and transformer etc.
Read moreof your Industry type