Tender Details
Particulars | Details |
---|---|
Title |
Flp Analyzer Hvac Pakage Ac Unit 5.5 Tr,Removal Damaged Ac,Desitc Of Hvac,Misc Air Conditiong Duct
|
Description |
|
Organisation | Bharat Petroleum Corporation Ltd | Ministry of Petroleum and Natural Gas |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | June 05, 2025 16:34 |
End Date |
26/06/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Flp analyzer hvac pakage ac unit 5.5 tr,removal damaged ac,desitc of hvac,misc air conditiong duct
Read more
Rate contract for repairing of air washer and central ac duct at pps iii
Please refer tender documents.
Read moreVrf air conditioning system and ms stand work for outdoor unit of ac at new hospital (ipd block) at mahila chikitsalaya, sanganery gate, jaipur
Vrf air conditioning system and ms stand work for outdoor unit of ac at new hospital (ipd block) at mahila chikitsalaya, sanganery gate, jaipur
Read moreSitc of 45x1.5 tr inverter type ductable split ac unit in various bharatnet olt and maan sites under bsnl up e circle, lucknow. rate contract
Sitc of 45x1.5 tr inverter type ductable split ac unit in various bharatnet olt and maan sites under bsnl up e circle, lucknow. rate contract
Read moreCustom bid for services - overhauling of central ac plant of capacity 30 tr (unit no 3) at technica
Read more
Pre-qualification for appointment of hvac consultant for replacement of existing 360 tr (12 compressors of 30 tr each) chiller based central ac plant of lho patna building and existing 480 tr (4 compressor of 120 tr each) chiller based central ac plant of patna main branch building with energy efficient chiller ac plant
Pre-qualification for appointment of hvac consultant for replacement of existing 360 tr (12 compressors of 30 tr each) chiller based central ac plant of lho patna building and existing 480 tr (4 compressor of 120 tr each) chiller based central ac plant of patna main branch building with energy efficient chiller ac plant
Read moreMtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
Mtps i mill plant unit i removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
Read moreSupply, installation, testing and commissioning of hvac system such as s/f of vrf system with air handling unit for 3t mri room at radio- diagnosis department, scbmch, cuttack
Electrical work
Read moreProcurement of danfoss make compressor (model no.-sm147a4nlb) for 22 tr water cooled package ac unit installed in dm plant and esp of ph-iv, stps, mppgcl
Procurement of danfoss make compressor (model no.-sm147a4nlb) for 22 tr water cooled package ac unit installed in dm plant and esp of ph-iv, stps, mppgcl
Read moreof your Industry type