Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rapid Prototyping/Real Time Controller
|
| Description |
|
| Organisation | Department of Higher Education | Ministry of Education |
| Tender Id | GEM/2024/B/4681211 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | February 23, 2024 23:17 |
| End Date |
Expired
15/03/2024
Expired 943 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | ATINDRIYA SYSTEMS PRIVATE LIMITED | Make : speed goat Model : speedgoat base line m Title : speed goat edu baseline m fpga starter | 15-03-2024 12:31:59 | Registered with designated Agency / Authority | MII N/A | Qualified |
| 2 | AV DESIGNERS | Make : Speed goat Model : Speedgoat base line m Title : Speed goat edu baseline m fpga starter | 14-03-2024 15:59:23 | Registered with designated Agency / Authority | MII N/A | Qualified |
| 3 | TRIDENT INFOSOL PRIVATE LIMITED. | Make : Speedgoat GmbH Model : Rapid prototyping/real time controller Title : Rapid prototyping/real time controller | 15-03-2024 10:22:46 | Offline upload | MII | Qualified |
Supply of coal and sand filter media for rapid gravity sand filters of water systems
Supply of coal and sand filter media for rapid gravity sand filters of water systems
Read moreElevator spares including installation and programming of controller for tp-29 elevator
Elevator spares including installation and programming of controller for tp-29 elevator
Read moreComprehensive annual maintenance contract (amc), annual technical support (ats), cloud hosting, connectivity and real time operational support for the automated system balancing mechanism (asbm) and maintenance of hardware installed at state load dispatch centre (sldc) and associated 16 grid sub-stations (gss) for 5 years against nit no. 37/pr/bsptcl/2026.
Comprehensive annual maintenance contract (amc), annual technical support (ats), cloud hosting, connectivity and real time operational support for the automated system balancing mechanism (asbm) and maintenance of hardware installed at state load dispatch centre (sldc) and associated 16 grid sub-stations (gss) for 5 years against nit no. 37/pr/bsptcl/2026.
Read moreSupply of display controller unit for alfalaval make main turbine lube oil purification system
Supply of display controller unit for alfalaval make main turbine lube oil purification system
Read moreSupply, installation, testing, commissioning and demonstration of survey rover receiver and controller with gnss field survey software and accessories, including three years on site warranty and training
Supply, installation, testing, commissioning and demonstration of survey rover receiver and controller with gnss field survey software and accessories, including three years on site warranty and training
Read moreSupply, demonstration, commissioning of all software/ updation / enhancement from time to time of profometer rebar diameter & advance concrete cover meter, from concrete rebar detection to line scanning, precise concrete rebar cover measurements and diameter estimation with great clarity of precision, ergonomics productivity and technical specification are as follow:- 1. profometer app. - technical specifications:- (i) review modes:- area scan view multiline scan view, (ii) im
Supply, demonstration, commissioning of all software/ updation / enhancement from time to time of profometer rebar diameter & advance concrete cover meter, from concrete rebar detection to line scanning, precise concrete rebar cover measurements and diameter estimation with great clarity of precision, ergonomics productivity and technical specification are as follow:- 1. profometer app. - technical specifications:- (i) review modes:- area scan view multiline scan view, (ii) image processing:- auto rebar spacing first rebar layer neighboring rebar correction first layer neighboring rebar correction second layer, (iii) display settings:- concrete cover threshold slider with color palette, (iv) reporting:- instant report generation jpg (screenshot), (v) display unit specs:- screen size: from 7.9 inch to 12.9 inch, resolution : up to 2732-by-2048, memory: up to 02 tb, weight: down to 301 gm/10.6 oz, camera: up to 12 mp wide and 10 mp ultra wide, optional: usb-c, 5g, face id, (vi) display unit sensors:- three – axis gyro, accelerometer, ambient light sensor barometer built -in- gps/gnss (2) instrument. technical specifications:- (i) technology:- eddy-current, (ii) connection:- wireless, (iii) cover measuring depth:- up to 185 mm/7.3in, (iv) cover measuring accuracy:- +/-1 mm/ 0.04 in to 4 mm/ 0.16 in depending on depth , (v) rebar diameter measuring depth:- up to 63 mm/2.5 in, (vi) rebar diameter measuring accuracy:- +/-1 rebar size (possible under optimal conditions. please refer to the manual), (vii) encoder accuracy:- +/-0.5 mm/0.02 in +0.05% of measured length, (viii) max scanning speed:- 0.5 m/s – 1.7 ft/s, (ix) max line scan distance:- 1 km/ 0.6 miles, (x) display:- high-contrast loed screen, (xi) dimensions:-250x130x45 mm / 9.8x5.1x1.8 in (with cart), 190x75x45 mm / 7.5x3.0x1.8 in (without cart) (xii) weight:- 690 gm/ 1.5 ib (with cart), 300 gm / 0.7 ib (without cart), (xiii) battery:- 2x aa(nimh) rechargeable or non rechargeable removable flight-safe, 8 hours autonomy, usb-c power bank (not included)
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreof your Industry type