Tender Details
Particulars | Details |
---|---|
Title |
Trengthening Work Of Road From (1). D.A.V. School To Karimati (L 2.850 Km.), (2). Khorahar To Kedarut (L 5.100 Km.), , (6). Kewla More To Bardeva (L 2.750 Km.) Pkg Rwd/Haz/Stpkg/02/2024 25
|
Description |
Trengthening Work Of Road From (1). D.A.V. School To Karimati (L 2.850 Km.), (2). Khorahar To Kedarut (L 5.100 Km.), , (6). Kewla More To Bardeva (L 2.750 Km.) Pkg Rwd/Haz/Stpkg/02/2024 25
|
Organisation | RWD EinC | State Govt. and UT |
Tender Id | 2024_RWD_90241_1 |
Reference Number |
04/2024-25/RWD/EE/HAZARIBAG |
Tender Fee | 10000 |
EMD | 25.5 Lakh |
Tender Value | |
Place | HAZARIBAG |
Link | https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=121846 |
Start Date | August 13, 2024 22:20 |
End Date |
23/08/2024 ( Expired 272 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)
Upgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)
Read morePr of road from dafidar para baily bridge to saudiram para bailey bridge via abhicharan bazar during the year 2024-25/sh wbm-iii, carpeting, drain and earth filling etc(l-3.20 km).
Pr of road from dafidar para baily bridge to saudiram para bailey bridge via abhicharan bazar during the year 2024-25/sh wbm-iii, carpeting, drain and earth filling etc(l-3.20 km).
Read moreR and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
R and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
Read moreConstruction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode
Construction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreRwd/ee/godda/38/2024-25, construction of road from pasai to badairadih (l-1.300 km.)
Rwd/ee/godda/38/2024-25, construction of road from pasai to badairadih (l-1.300 km.)
Read morePr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km
Pr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km
Read morePr of road from nh 08 ptl petrol pump to ptl railway station road l 1 00 km during the year 2025 26 sh surface drain patch metalling carpeting seal coat and protection works from ch 0 00 km to ch 1 00km
Pr of road from nh 08 ptl petrol pump to ptl railway station road l 1 00 km during the year 2025 26 sh surface drain patch metalling carpeting seal coat and protection works from ch 0 00 km to ch 1 00km
Read morePr of road from hazibari school to joyganti school l 1 20 km under the jurisdiction of ganganagar pwd sub division during the year 2025 26 sh stripping katcha drain grouting tack coat carpeting seal coat etc gr i
Pr of road from hazibari school to joyganti school l 1 20 km under the jurisdiction of ganganagar pwd sub division during the year 2025 26 sh stripping katcha drain grouting tack coat carpeting seal coat etc gr i
Read morePr of road from hazibari school to joyganti school l 0 85 km under the jurisdiction of ganganagar pwd sub division during the year 2025 26 sh stripping pcc work katcha drain wbm tack coat carpetting seal coat etc gr ii
Pr of road from hazibari school to joyganti school l 0 85 km under the jurisdiction of ganganagar pwd sub division during the year 2025 26 sh stripping pcc work katcha drain wbm tack coat carpetting seal coat etc gr ii
Read moreof your Industry type