Tender Details

Particulars Details
Title
For The Work Of Deposit Scheme To Release New Connection/Additional Load /Line Shifting And Others Deposit Work Under Area Of Electricity Urban Distribution Division Ee 33 Kv Line, Meerut.
Description
For The Work Of Deposit Scheme To Release New Connection/Additional Load /Line Shifting And Others Deposit Work Under Area Of Electricity Urban Distribution Division Ee 33 Kv Line, Meerut.
Organisation Paschimanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT
Tender Id 2025_PVVNL_1033852_1
Reference
Number
E-Tender No.-164/EUDC/MEERUT/2024-2025
Tender Fee 5900
EMD 2 Lakh
Tender Value
Place SE EUDC MEERUT
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1871856
Start Date April 29, 2025 14:30
End Date

05/05/2025 ( Expired 32 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Lt and ht power line shifting and electrification work from company chowk to mandla bus stand under dindori urban area

Lt and ht power line shifting and electrification work from company chowk to mandla bus stand under dindori urban area

Read more
The work of construction of new 33 kv bay barahi at 220 kv substation under electricity transmission division sambhal

The work of construction of new 33 kv bay barahi at 220 kv substation under electricity transmission division sambhal

Read more
Trenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (23 nos lc gates) in varanasi division/ner under jurisdiction of tier-2/varanasi (prayagraj territory)

Trenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (23 nos lc gates) in varanasi division/ner under jurisdiction of tier-2/varanasi (prayagraj territory)

Read more
Carrying out patrolling routine breakdown maintenance of 220 kv d c dumka govindpur transmission line 50 85 km under transmission sub division madanpur for the f y 2025 26 i e from 01 07 2025 to 31 03 2026 i e 09 months

Carrying out patrolling routine breakdown maintenance of 220 kv d c dumka govindpur transmission line 50 85 km under transmission sub division madanpur for the f y 2025 26 i e from 01 07 2025 to 31 03 2026 i e 09 months

Read more
Wbphed/ee/maad/niet _04 of 2025-2026. sl. no. 17

Annual operation and maintenance of airp and day to day operation, maintenance and emergent repair at mahabbatpur (zone i and ii) w/s scheme in english bazar block under malda arsenic area w/s division, phe dte. (for one year).

Read more
Supply of material and di of 220 kv bansi-pgcil double circuit transmission line between location no. 200 to 207 under electricity transmission division-ii, basti h.q. at siddharth nagar

Supply of material and di of 220 kv bansi-pgcil double circuit transmission line between location no. 200 to 207 under electricity transmission division-ii, basti h.q. at siddharth nagar

Read more
Trenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (20 nos lc gates) in varanasi division/ner nearby mau under jurisdiction of tier-2/varanasi(prayagraj territory).

Trenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (20 nos lc gates) in varanasi division/ner nearby mau under jurisdiction of tier-2/varanasi(prayagraj territory).

Read more
Drilling of 175 mm dia and 150 meter deep tubewell with installation of sumbrsible motor pump ser including electrification work/installation complete and tee connection new pipe line to old distribution network at different location of under sub div

Drilling of 175 mm dia and 150 meter deep tubewell with installation of sumbrsible motor pump ser including electrification work/installation complete and tee connection new pipe line to old distribution network at different location of under sub div

Read more
Drilling of 175 mm dia and 150 meter deep tubewell with installation of sumbersible motor pump including electrification work/installation complete and tee connection new pipe line to old distribution nerwork at different location under sub divis

Drilling of 175 mm dia and 150 meter deep tubewell with installation of sumbersible motor pump including electrification work/installation complete and tee connection new pipe line to old distribution nerwork at different location under sub divis

Read more
Shifting of 11 kv line samaleswari feeder for development of maa samaleswari temple area under samalei plan- phase-ii at sambalpur under badabazar electrical section.

Shifting of 11 kv line samaleswari feeder for development of maa samaleswari temple area under samalei plan- phase-ii at sambalpur under badabazar electrical section

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise