Tender Details
Particulars | Details |
---|---|
Title |
For The Work Of Deposit Scheme To Release New Connection/Additional Load /Line Shifting And Others Deposit Work Under Area Of Electricity Urban Distribution Division Ee 33 Kv Line, Meerut.
|
Description |
For The Work Of Deposit Scheme To Release New Connection/Additional Load /Line Shifting And Others Deposit Work Under Area Of Electricity Urban Distribution Division Ee 33 Kv Line, Meerut.
|
Organisation | Paschimanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT |
Tender Id | 2025_PVVNL_1033852_1 |
Reference Number |
E-Tender No.-164/EUDC/MEERUT/2024-2025 |
Tender Fee | 5900 |
EMD | 2 Lakh |
Tender Value | |
Place | SE EUDC MEERUT |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1871856 |
Start Date | April 29, 2025 14:30 |
End Date |
05/05/2025 ( Expired 32 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Lt and ht power line shifting and electrification work from company chowk to mandla bus stand under dindori urban area
Lt and ht power line shifting and electrification work from company chowk to mandla bus stand under dindori urban area
Read moreThe work of construction of new 33 kv bay barahi at 220 kv substation under electricity transmission division sambhal
The work of construction of new 33 kv bay barahi at 220 kv substation under electricity transmission division sambhal
Read moreTrenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (23 nos lc gates) in varanasi division/ner under jurisdiction of tier-2/varanasi (prayagraj territory)
Trenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (23 nos lc gates) in varanasi division/ner under jurisdiction of tier-2/varanasi (prayagraj territory)
Read moreCarrying out patrolling routine breakdown maintenance of 220 kv d c dumka govindpur transmission line 50 85 km under transmission sub division madanpur for the f y 2025 26 i e from 01 07 2025 to 31 03 2026 i e 09 months
Carrying out patrolling routine breakdown maintenance of 220 kv d c dumka govindpur transmission line 50 85 km under transmission sub division madanpur for the f y 2025 26 i e from 01 07 2025 to 31 03 2026 i e 09 months
Read moreWbphed/ee/maad/niet _04 of 2025-2026. sl. no. 17
Annual operation and maintenance of airp and day to day operation, maintenance and emergent repair at mahabbatpur (zone i and ii) w/s scheme in english bazar block under malda arsenic area w/s division, phe dte. (for one year).
Read moreSupply of material and di of 220 kv bansi-pgcil double circuit transmission line between location no. 200 to 207 under electricity transmission division-ii, basti h.q. at siddharth nagar
Supply of material and di of 220 kv bansi-pgcil double circuit transmission line between location no. 200 to 207 under electricity transmission division-ii, basti h.q. at siddharth nagar
Read moreTrenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (20 nos lc gates) in varanasi division/ner nearby mau under jurisdiction of tier-2/varanasi(prayagraj territory).
Trenching, laying, termination, splicing, testing and commissioning for shifting of ofc due to infringement during lhs/rub/rob work (20 nos lc gates) in varanasi division/ner nearby mau under jurisdiction of tier-2/varanasi(prayagraj territory).
Read moreDrilling of 175 mm dia and 150 meter deep tubewell with installation of sumbrsible motor pump ser including electrification work/installation complete and tee connection new pipe line to old distribution network at different location of under sub div
Drilling of 175 mm dia and 150 meter deep tubewell with installation of sumbrsible motor pump ser including electrification work/installation complete and tee connection new pipe line to old distribution network at different location of under sub div
Read moreDrilling of 175 mm dia and 150 meter deep tubewell with installation of sumbersible motor pump including electrification work/installation complete and tee connection new pipe line to old distribution nerwork at different location under sub divis
Drilling of 175 mm dia and 150 meter deep tubewell with installation of sumbersible motor pump including electrification work/installation complete and tee connection new pipe line to old distribution nerwork at different location under sub divis
Read moreShifting of 11 kv line samaleswari feeder for development of maa samaleswari temple area under samalei plan- phase-ii at sambalpur under badabazar electrical section.
Shifting of 11 kv line samaleswari feeder for development of maa samaleswari temple area under samalei plan- phase-ii at sambalpur under badabazar electrical section
Read moreof your Industry type