| Particulars | Details |
|---|---|
| Title |
Hot Tapping And Stopple Plugging On Pipelines
|
| Description |
Hot Tapping And Stopple Plugging On Pipelines
|
| Organisation | Engineers India Limited,MoPNG | Central Govt. Ministry/Department |
| Tender Id | 2024_EIL_790285_1 |
|
Reference Number |
RC/B448-020-MP-T-9530/1011 |
| Tender Fee | 0 |
| EMD | 10 Lakh |
| Tender Value | - |
| Place | BPCL URAN |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=830663 |
| Start Date | January 19, 2024 22:30 |
| End Date |
Expired
15/02/2024
Expired 969 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Outsourcing of laying and commissioning of ug pumps delivery pipelines at shanthikhani mine.
Outsourcing of laying and commissioning of ug pumps delivery pipelines at shanthikhani mine.
Read moreSupply of control damper assembly for mill hot primary air of unit-xi boiler
Supply of control damper assembly for mill hot primary air of unit-xi boiler
Read moreKtps- v vi stages- o m-ii- providing brick supporting pedestals for extending 4 nos of ash disposal pipelines of ktps-v stage and 3 nos of ash disposal pipelines of ktps-vi stage at required locations all along the ab pond deep into the pond for uniform deposition of ash in the ab pond during the fy 2026-27
Ktps- v vi stages- o m-ii- providing brick supporting pedestals for extending 4 nos of ash disposal pipelines of ktps-v stage and 3 nos of ash disposal pipelines of ktps-vi stage at required locations all along the ab pond deep into the pond for uniform deposition of ash in the ab pond during the fy 2026-27
Read moreProcurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.
Procurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.
Read moreProviding permanent water supply and sanitation facilities by construction of ohsr, borewells with pump sets, pipelines and permanent toilet blocks at parnasala in bhadradri kothagudem district (reserved for sc category)
Providing permanent water supply and sanitation facilities by construction of ohsr, borewells with pump sets, pipelines and permanent toilet blocks at parnasala in bhadradri kothagudem district (reserved for sc category)
Read moreConstruction of hot dipped galvanized iron chain link mesh or compound wall of r and b circuit guest house in mahabubnagar district.
Construction of hot dipped galvanized iron chain link mesh or compound wall of r and b circuit guest house in mahabubnagar district.
Read moreDeputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.
Deputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.
Read moreLaying of 6inch dia. pipelines at sump-a/sump-b of the mine for dewatering of mine water through the 6th pump along with making alternative water supply arrangement to laiyo colony through upper side discharge point of eastern sump of the jharkhand o
Laying of 6inch dia. pipelines at sump-a/sump-b of the mine for dewatering of mine water through the 6th pump along with making alternative water supply arrangement to laiyo colony through upper side discharge point of eastern sump of the jharkhand o
Read moreSupply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreof your Industry type