Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Procurement Opportunity: Replacement Of Worn Out Components For Hc Pump 💧 The Public Health Engineering (Phe) Department Of The State Government And Union Territories Invites Bids For The Replacement Of Worn Out Components Of A 25000 Gph X 300 Meter Head, Low Speed Multi Stage Hc Pump Installed At Wss Hrt Lift Stage 3rd In Shalimar, Kishtwar Town. The Work Is Part Of Maintenance And Engineering (M And E) Activities. 📅 Bid Submission Deadline: 29/05/2024, 2:00 Pm Tender Fee: Inr 600 Emd: Inr 3200 Interested Bidders Are Advised To Refer To The Bill Of Quantities (Boq) For Detailed Specifications And Requirements. Bids Must Be Submitted In Accordance With The Tender Documents And Government Procurement Regulations. Keywords: Phe, State Govt. And Ut, Hc Pump, Maintenance And Engineering, Worn Out Components, Kishtwar, Tender, Bid, Boq| Particulars | Details |
|---|---|
| Title |
Replacement Of Worn Out Components By Way Of Providing /Fitting Of New Components Of 25000 Gph X 300 Meter Head, Low Speed Multi Stage Hc Pump Installed At Wss Hrt Lift Stage 3rd Shalimar, Kishtwar Town Under M And E.
|
| Description |
Refer Boq
|
| Organisation | PHE | State Govt. and UT |
| Tender Id | 2024_PHE_248622_1 |
|
Reference Number |
e-NIT No. 04 of 2024-25 Dated. 15-05-2024 |
| Tender Fee | 600 |
| EMD | 3200 |
| Tender Value | - |
| Place | KISHTWAR |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=724714 |
| Start Date | May 15, 2024 22:30 |
| End Date |
Expired
29/05/2024
Expired 814 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of worn-out mechanical components by way of providing /fitting of new components of 25000 gph x 250 meter head, low speed multi stage hc pump (ksb make) of unit no. 01 installed at wss hrt lift stage- 2nd (nallapar), shalimar, kishtw
Refer boq
Read moreRenovation/repair and of 25000 gph x 240 meter head, hc pump low speed along with allied works installed at hrt wss shalimar stage-2nd kishtwar.
Refer boq
Read more1. replacement of wornout components of 20000 gph x 250 meter head, high speed multi stage hc pump of unit no. - 03 installed at wss hrt lift stage-1st, shalimar, kishtwar town under m and r.
Refer boq
Read more2. recapitalization of 02 no. 25000 gph x 300 mh hc pumps (low/high speed) alongwith allied works installed at wss hrt lift, shalimar kishtwar under ut capex budget.
Refer boq
Read moreRepair of 20000 gph x 250-meter head, high speed multi stage horizontal centrifugal pump (wilo make) installed at wss hrt lift stage- 1st, shalimar, kishtwar town.
Refer boq
Read moreReplacement of wornout components of 20000 gph x 250 meter head, high speed multi stage hc pump of unit no. - 04 installed at wss hrt lift stage-2nd , shalimar, kishtwar town under m and r.
Refer boq
Read more1. design, fabrication, carriage, installation, testing and commissioning of 02 no. 400 ampere l.t control panel at wss hrt lift, shalimar kishtwar, recapitalization of 02 no. 25000 gph x 300 mh hc pumps (low/high speed) along with allied works insta
Refer boq
Read moreDesign, fabrication, carriage, installation, testing and commissioning of 02 no. 400 ampere l.t control panel at wss hrt lift, shalimar kishtwar, recapitalization of 02 no. 25000 gph x 300 mh hc pumps (low/high speed) along with allied works installe
Refer boq
Read moreReplacement of damaged parts of 4000 gph x 250 m head hc pump of wss chakarabhati stage- 3rd
Replacement of damaged parts of 4000 gph x 250 m head hc pump of wss chakarabhati stage- 3rd
Read moreReplacement of mechanical components of 10000 gph x 300 meter head hc pump set installed at pumping station sambal gangera stage 1st and 5000 gph x 350 meter head hc pump motor set installed at pumping station jib stage-1st (new).
Replacement of mechanical components of 10000 gph x 300 meter head hc pump set installed at pumping station sambal gangera stage 1st and 5000 gph x 350 meter head hc pump motor set installed at pumping station jib stage-1st (new).
Read moreof your Industry type