Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Jal Jeevan Mission (Jjm) Poruvazhy Constructing Retaining Wall And Compound Wall Arround The Ohsr At Devagiri Colony And Construction Of Compound Wall For Sump At Edakkad Market In Poruvazhy Constructing Retaining Wall And Compound Wall Arround The
|
Description |
Jal Jeevan Mission (Jjm) Poruvazhy &Amp#X0d
Constructing Retaining Wall And Compound Wall&Amp#X0d
Arround The Ohsr At Devagiri Colony And&Amp#X0d
Construction Of Compound Wall For Sump At&Amp#X0d
Edakkad Market In Poruvazhy.
|
Organisation | Kerala Water Authority | State Govt. and UT |
Tender Id | 2025_KWA_746573_1 |
Reference Number |
CE(SR)/TR/2426/2025_26_1_1/1 |
Tender Fee | 2760 |
EMD | 50000 |
Tender Value | |
Place | Poruvazhy |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1205466 |
Start Date | March 05, 2025 22:30 |
End Date |
19/03/2025 ( Expired 89 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction of buttress wall beside 14 service center below the active waste dump 40 mtr and 30 mtr in length at dep 14 biom kirandul complex
Construction of buttress wall beside 14 service center below the active waste dump 40 mtr and 30 mtr in length at dep 14 biom kirandul complex
Read morePackage-1, works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw phase-ii solar power park for the development of 1200mw jalaun solar power park under umrepp
Works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw (phase-ii) solar power park for the development of 1200mw jalaun solar power park at pathrahi and amrod in jalaun
Read moreConstruction of rrm protection wall at new tower no.: 04
Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreConstruction of additional 3rd 4th and 5th floors to the centre of excellence for pediatric institute of child health and research centre building in government rajaji hospital at madurai
Construction of additional 3rd 4th and 5th floors to the centre of excellence for pediatric institute of child health and research centre building in government rajaji hospital at madurai
Read moreIndependent engineering services for construction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Independent engineering services for construction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Read moreMinor civil repair, painting and levelling and dressing at different venues in ctps colony for celebration of republic day, independence day and other social and cultural s at dvc, ctps.
Minor civil repair, painting and levelling and dressing at different venues in ctps colony for celebration of republic day, independence day and other social and cultural s at dvc, ctps.
Read moreProvn of compound wall with gate and watch tower in 4032 sq mtr (01 acre) land for radar station at suhelipar island under dhq-12 kavaratti under ge (navy) lakshadweep
Provn of compound wall with gate and watch tower in 4032 sq mtr (01 acre) land for radar station at suhelipar island under dhq-12 kavaratti under ge (navy) lakshadweep
Read moreof your Industry type