Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I M Ii Chp I Reconditioning Of Damaged Worn Out Uneven Size Support Wheels 4 Nos Released From Primary Crusher A B
|
| Description |
Mtps I M Ii Chp I Reconditioning Of Damaged Worn Out Uneven Size Support Wheels 4 Nos Released From Primary Crusher A B
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_496853_1 |
|
Reference Number |
CE SE M II MTPS I CHP I OT 28 2024 2025 |
| Tender Fee | 0 |
| EMD | 2800 |
| Tender Value | - |
| Place | MTPS-I |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=590369 |
| Start Date | October 25, 2024 23:10 |
| End Date |
Expired
11/11/2024
Expired 706 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing/ reclamation and hard facing of worn-out teeth of crusher roll of btl chp.
Repairing/ reclamation and hard facing of worn-out teeth of crusher roll of btl chp.
Read moreRepairing/overhauling of primary gyratory crusher kb 63-75 installed at central chp, nigahi project
Repairing/overhauling of primary gyratory crusher kb 63-75 installed at central chp, nigahi project
Read moreMtps i civil circle improvement works by replacing the existing damaged ac sheets / ridge pieces with new galvalume corrugated sheets of thickness not less than 0.8 mm for roofing of the primary crusher house in chp area at mtps i
Mtps i civil circle improvement works by replacing the existing damaged ac sheets / ridge pieces with new galvalume corrugated sheets of thickness not less than 0.8 mm for roofing of the primary crusher house in chp area at mtps i
Read moreMtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Read moreMtps i mill plant unit iii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 3a 3b 3c 3f tilting work
Mtps i mill plant unit iii complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 3a 3b 3c 3f tilting work
Read moreMtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Read moreWc for complete repairing of rotary breaker tyre of rb 03 n rb 04 along with repairing refurbishment of bearing wheel assembly main support wheel and thrust wheel and repairing reconditioning of longitudinal beam for 2x660 mw, chp, ph ii
Wc for complete repairing of rotary breaker tyre of rb 03 n rb 04 along with repairing refurbishment of bearing wheel assembly main support wheel and thrust wheel and repairing reconditioning of longitudinal beam for 2x660 mw, chp, ph ii
Read moreMtps i chp i reconditioning of damaged worn out uneven size support wheels 4 nos released from primary crusher
Mtps i chp i reconditioning of damaged worn out uneven size support wheels 4 nos released from primary crusher
Read moreMtps i m ii chp ii reconditioning of worn out hydraulic cylinder for scr machines released from scr machine ii boom luffing systems
Mtps i m ii chp ii reconditioning of worn out hydraulic cylinder for scr machines released from scr machine ii boom luffing systems
Read moreMtps i mill plant reconditioning of worn out upper journal housing released from unit i to iv mills
Mtps i mill plant reconditioning of worn out upper journal housing released from unit i to iv mills
Read moreof your Industry type