Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Hl Bridge Over River Local Nallah At Ch 26 955 Km On Manamunda Sagada Gundulia Road In The District Of Boudh Under State Plan
|
| Description |
Construction Of Hl Bridge Over River Local Nallah At Ch 26 955 Km On Manamunda Sagada Gundulia Road In The District Of Boudh Under State Plan
|
| Organisation | Government of Odisha |
| Tender Id | 2023_EICCL_97612_3 |
|
Reference Number |
CCE_R and B_PLB_18 of 2023_24 |
| Tender Fee | 10000 |
| EMD | 6.13 Lakh |
| Tender Value | |
| Place | Office of the CCE Phulbani RandB Circle Phulbani |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in |
| Start Date | December 02, 2023 15:30 |
| End Date |
Expired
16/12/2023
Expired 927 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Read moreConstruction of bridge over river bansi at pipra gola ghat in district kushinagar
Construction of bridge over river bansi at pipra gola ghat in district kushinagar
Read more1 - construction of causeway / culvert at bhoikhera to bcw on berach river in uit area, chittorgarh
1 - construction of causeway / culvert at bhoikhera to bcw on berach river in uit area, chittorgarh
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConstruction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Construction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreUnder district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreof your Industry type