Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Heightening, Proper Grading And Aligning Of Foot Stool Structure Of 1200mm Wide 3rd Belt Conveyor From 12 L To Tail End At 15 Xd After Cleaning Of Debris And Fallen Coal Under Belt Conveyor Structure For A Length Of Approx 480 Mtr At 3n4 Incline, Jpc
|
| Description |
Heightening, Proper Grading And Aligning Of Foot Stool Structure Of 1200mm Wide 3rd Belt Conveyor From 12 L To Tail End At 15 Xd After Cleaning Of Debris And Fallen Coal Under Belt Conveyor Structure For A Length Of Approx 480 Mtr At 3n4 Incline, Jpc
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_ECL_291544_1 |
|
Reference Number |
ECL/GM/JNR/EnM/A2/23-24/35 dated 17-10-2023 |
| Tender Fee | |
| EMD | 4500 |
| Tender Value | |
| Place | Online |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | October 19, 2023 16:30 |
| End Date |
Expired
03/11/2023
Expired 955 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Heightening, proper grading aligning of foot stool structure of 1000mm wide 19xd t belt conveyor in lhcm-2 section of r-vii seam at 3n4 incline, j.p.colly
Heightening, proper grading aligning of foot stool structure of 1000mm wide 19xd t belt conveyor in lhcm-2 section of r-vii seam at 3n4 incline, j.p.colly
Read moreHeightening, proper grading aligning of foot stool structure of 1400mm 1st belt conveyor from 120m to 420m in belt incline for a length of 300m after necessary cleaning of debris n fallen coal near foot stool at ug of mic unit of j.p.colly
Heightening, proper grading aligning of foot stool structure of 1400mm 1st belt conveyor from 120m to 420m in belt incline for a length of 300m after necessary cleaning of debris n fallen coal near foot stool at ug of mic unit of j.p.colly
Read moreHeightening, proper grading and aligning of foot stool structure of 1200mm steel cord belt conveyor from 250mtr to 550mtr in belt incline for a length of 300mtr and 1200mm 2nd belt conveyor from 750mtr to 1050mtr in belt incline for a length of 300m
Heightening, proper grading and alligning of foot stool structure of 1200mm steel cord belt conveyor from 250mtr to 550mtr in belt incline for a length of 300mtr and 1200mm 2nd belt conveyor from 750mtr to 1050mtr in belt incline for a length of 300
Read moreReplacement of three nos. motors change at 15xd tandem belt, 72l belt and -11d(3rd) belt at 3n4 incline, jpc
Replacement of three nos. motors change at 15xd tandem belt, 72l belt and -11d(3rd) belt at 3n4 incline, jpc
Read moreHeightening and proper alignment of structures at 80l belt conveyor at lhcm 1, r viia seam, 3n4 incline, j.p.colly.
Heightening and proper alignment of structures at 80l belt conveyor at lhcm 1, r viia seam, 3n4 incline, j.p.colly.
Read moreCleaning of coal muck debris accumulated along belt conveyor route at main incline mic unit jpc
Cleaning of coal muck debris accumulated along belt conveyor route at main incline mic unit jpc
Read moreCleaning of coal muck debris accumulated along belt conveyor route at 3 and 4 incline unit jpc
Cleaning of coal muck debris accumulated along belt conveyor route at 3 and 4 incline unit jpc
Read moreMotor replacement of three belt conveyors, equalising pinion replacement of 15xd tandem belt, gear replacement of -11d(1st) belt n tail end shifting of -11d(3rd) belt at r-viia seam of 3n4 incline unit, jhanjra project colliery.
Motor replacement of three belt conveyors, equalising pinion replacement of 15xd tandem belt, gear replacement of -11d(1st) belt n tail end shifting of -11d(3rd) belt at r-viia seam of 3n4 incline unit, jhanjra project colliery.
Read moreReplacement of out of order drive drum at 74al belt conveyor, gear box at 72l belt conveyor, tail end drum of 65 l belt conveyor, change of damaged belting at 65 l, 72 l, 74l in r-vii seam at lhcm2 section of 3n4 incline,jpc
Replacement of out of order drive drum at 74al belt conveyor, gear box at 72l belt conveyor, tail end drum of 65 l belt conveyor, change of damaged belting at 65 l, 72 l, 74l in r-vii seam at lhcm2 section of 3n4 incline,jpc
Read moreTransportation-installation of 310.5mtr 1000mm belt structure with belting and nine times transportation-installation of tail end unit at 80l tandem belt conveyor in panel-9, r-viia seam of 3n4 incline
Transportation-installation of 310.5mtr 1000mm belt structure with belting and nine times transportation-installation of tail end unit at 80l tandem belt conveyor in panel-9, r-viia seam of 3n4 incline
Read moreof your Industry type