Tender Details

Particulars Details
Title
Manpower Assistance In Operation Of Conveyor 17 And 18 Including Ttr And Auxiliaries Of Chp, Btps
Description
Manpower Assistance In Operation Of Conveyor 17 And 18 Including Ttr And Auxiliaries Of Chp, Btps
Organisation Central Public Procurement Portal 2
Tender Id 2023_DVC_159162_1
Reference
Number
DVC/Tender/BTPS/CHP 1/CnM/WandS/16
Tender Fee 2000
EMD 92595
Tender Value -
Place BTPS
Link
View Original Tender Notice

https://etenders.gov.in

Start Date June 28, 2023 18:00
End Date
Expired 06/09/2023

Expired 1132 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply of various types of special electrodes for mm/chp/btps

Supply of various types of special electrodes for mm/chp/btps

Read more
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.

Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.

Read more
Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru

Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru

Read more
Supply of electromagnetic type suspension magnet required by lt-1/o and e/chp/ btps

Supply of electromagnetic type suspension magnet required by lt-1/o and e/chp/ btps

Read more
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Read more
Tggenco-ktps-vii stage-mm-chp- procurement of bearing and sleeves for conveyor pulleys, various gearboxes, sump pumps, fluid couplings and esc-584 scoop couplings

Tggenco-ktps-vii stage-mm-chp- procurement of bearing and sleeves for conveyor pulleys, various gearboxes, sump pumps, fluid couplings and esc-584 scoop couplings

Read more
Lifting of deris at balkapu nala at a) bridge no.17 to 18 b) bridge no.18 to 19 under syed nagar -139 cir no.33, gz ghmc (item no.5)

Lifting of deris at balkapu nala at a) bridge no.17 to 18 b) bridge no.18 to 19 under syed nagar -139 cir no.33, gz ghmc (item no.5)

Read more
Special repair to bldg no. t-17,t-18,t-19 and and t-28 of manjakote garrison under age(i) palma

Special repair to bldg no. t-17,t-18,t-19 and and t-28 of manjakote garrison under age(i) palma

Read more
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Read more
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise