Tender Details
About Tender
🌳 Jungle Cleaning Services Required By Northern Coalfields Limited 🌳 Northern Coalfields Limited (Nccl), A Public Sector Undertaking, Is Seeking A Service Provider For Jungle Cleaning Activities At The Bina Project Site. The Scope Of Work Includes The Uprooting Of Unwanted Vegetation, Trimming Of Trees, And Collection Of Wood Samples As Required. 📅 Submission Deadline: May 10, 2024, 9:00 Am The Tender Fee Is Set At Inr 2500, With The Last Date For Bid Submission Being May 10, 2024. Service Providers Must Focus On Labor Charges Only For This Project. Interested Parties Should Submit Detailed Proposals, Highlighting Their Expertise In Handling Such Environmental Tasks And Their Ability To Adhere To The Project Timelines. Keywords: Jungle Cleaning, Environmental Services, Northern Coalfields Limited, Psu, Labour Charges, Bina Project, Tender, Bid SubmissionParticulars | Details |
---|---|
Title |
Jungle Cleaning Including Uprooting Of Rank Vegetation, Grass, Bushes, Wood Samples And Trimming Of Trees Etc., On As And When Required Basis In Chp, Bina Project (Labour Charges Only)
|
Description |
Jungle Cleaning Including Uprooting Of Rank Vegetation, Grass, Bushes, Wood Samples And Trimming Of Trees Etc., On As And When Required Basis In Chp, Bina Project (Labour Charges Only)
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_NCL_307116_1 |
Reference Number |
B/EM/eTender/2024-25/06, dt. - 26.04.2024 |
Tender Fee | 0 |
EMD | 2500 |
Tender Value | |
Place | Bina Project |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=318255 |
Start Date | April 29, 2024 14:30 |
End Date |
10/05/2024 ( Expired 371 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared. a
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared. a
Read moreLaying and replacement of n/n conveyor belting (as and when required) in chp, bina project (labour charges only)
Laying and replacement of n/n conveyor belting (as and when required) in chp, bina project (labour charges only)
Read moreCleaning of installed solar panels of 250 kw capacity at the roof tops of g.m. office administrative building and silver jubilee hospital (once a week) and trimming of trees along the periphery of both the rooftops on as n when required basis for 1yr
Cleaning of installed solar panels of 250 kw capacity at the roof tops of g.m. office administrative building and silver jubilee hospital (once a week) and trimming of trees along the periphery of both the rooftops on as n when required basis for 1yr
Read moreProviding assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.0
Providing assistance for uninterrupted coal conveyance from wagon tipplers 1 to 4 to crushers crusher to bunkers due to complete wet coal at different chutes, location transfer points and providing of labour charges for breaking clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 1 to 4 grid hoppers in operation division/chp/stage- iii/dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Read moreProviding assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from
Providing assistance at different chutes, location transfer points for uninterrupted coal conveyance from wagon tipplers 5 6 to crushers crusher to bunkers due to complete wet coal and providing of labour charges for breaking and clearing of heavy size coal boulders and shale in coal rakes received from m/s mcl, m/s sccl, m/s ecl and m/s wcl coal clearing on wagon tipplers 56 grid hoppers in operation division /chp/stage- iiiiv /dr.nttps as and when required, during the period from 01.04.2025 or from the date of commencement of work to 31.03.2026 or till the exhaust of quantities.
Read moreCarrying out the structural steel work in all sections of chp, bina project (ncl) on as and when required basis within 730 days.
Carrying out the structural steel work in all sections of chp, bina project (ncl) on as and when required basis within 730 days.
Read moreCleaning of jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings at main substation 2x3mva, workshop chowk switching station, rohini colony switching station, birsa chowk switching station, wb 02 and rks talab four tim
Cleaning of jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings at main substation 2x3mva, workshop chowk switching station, rohini colony switching station, birsa chowk switching station, wb 02 and rks talab four tim
Read moreDismantling / dis-assembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days two years at chp, bina project
Dismantling / dis-assembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days two years at chp, bina project
Read moreAnnual maintenance contract (on as and when required basis) for cleaning of drain, manholes, sewerage lines, bushes and jungles inside hospital and housing complex at aiims, bhubaneswar
Annual maintenance contract (on as and when required basis) for cleaning of drain, manholes, sewerage lines, bushes and jungles inside hospital and housing complex at aiims, bhubaneswar
Read moreLaying and replacement of n n conveyor belting as and when required in chp, bina project labour charges only
Laying and replacement of n n conveyor belting as and when required in chp, bina project labour charges only
Read moreof your Industry type