Tender Details

Particulars Details
Title
Widening And Strengthening Of Barkas To Nadargul Road From Km 2.0 To 10.0 And Midhani Township Km 10/0 Barkas Nadargul Road To Nagarjunsagar Road From Km 8.8 To 15.0 In Rangareddy District Balance Work Estimate Sub Estimate Road Safety Interventions
Description
Widening And Strengthening Of Barkas To Nadargul Road From Km 2.0 To 10.0 And Midhani Township Km 10/0 Barkas Nadargul Road To Nagarjunsagar Road From Km 8.8 To 15.0 In Rangareddy District Balance Work Estimate Sub Estimate Road Safety Interventions
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2024_MoRTH_839092_1
Reference
Number
SE RandB NH HYD 12 2024 25 Dt. 10.12.2024
Tender Fee 11800
EMD 25100
Tender Value
Place Hyderabad
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=881945
Start Date December 11, 2024 00:15
End Date

17/12/2024 ( Expired 174 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge

Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge

Read more
Link road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work

Link road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram under jhargram division, p.w.dte under ridf-xxx., project id - pd242529252s000

Read more
Strengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years

Strengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years

Read more
Balance work of repair and upgradation of road from jerthan mahadev mandir to abdul sk aftans house under jerthan gram panchayet within egra-i panchayet samity in the district of purba medinipur(length- 2.750 km.)

Balance work of repair and upgradation of road from jerthan mahadev mandir to abdul sk aftans house under jerthan gram panchayet within egra-i panchayet samity in the district of purba medinipur(length- 2.750 km.)

Read more
Widening and strengthening to yerrupalem -jamalapuram road from km 0/0 to 6/700 and jamalapuram -chandrugudem road from km 0/0 to 6/770 in khammam district. sub work:providing road safety interventions.

Widening and strengthening to yerrupalem -jamalapuram road from km 0/0 to 6/700 and jamalapuram -chandrugudem road from km 0/0 to 6/770 in khammam district. sub work:providing road safety interventions.

Read more
1. improvements to road from km 0/75 to 2/25 4/8 to 5/4 of allur to main road nandikotkur in nandyal district. 2. improvements to road from km 0/0 to 10/6 of brahmanakotkur midthur road in nandyal district.

1. improvements to road from km 0/75 to 2/25 4/8 to 5/4 of allur to main road nandikotkur in nandyal district. 2. improvements to road from km 0/0 to 10/6 of brahmanakotkur midthur road in nandyal district.

Read more
Crr

Widening bt on road from rb road to rb road via quthbullapur and gowrelli (v), abdullapurmet mandal in rangareddy district est.cost rs.130.00lakhs, under crr (plain) 2023-24-1st call.

Read more
Wbpwd(r)/se/ chc/nit-01/ 25-26/1 / kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.

Kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.

Read more
Package no. 02 -strengthening to the road from vadagadu kothamangalam road to vadagadu ad colony road km 0/0-0/400 in vadagadu panchayat - thiruvarankulam panchayat union, pudukkottai district under rural infrastructure scheme (ris) savings fund 2

Package no. 02 -strengthening to the road from vadagadu kothamangalam road to vadagadu ad colony road km 0/0-0/400 in vadagadu panchayat - thiruvarankulam panchayat union, pudukkottai district under rural infrastructure scheme (ris) savings fund 2

Read more
Package no. 01 strengthening to the road from vadagadu ad colony to manickam ricemill road km 0/0-0/330 in vadagadu panchayat, thiruvarankulam panchayat union, pudukkottai district under rural infrastructure scheme (ris) savings fund 2025-26

Package no. 01 strengthening to the road from vadagadu ad colony to manickam ricemill road km 0/0-0/330 in vadagadu panchayat, thiruvarankulam panchayat union, pudukkottai district under rural infrastructure scheme (ris) savings fund 2025-26

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise