Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
1(one) No Pwd Road Crosssing Sh 34 At Mini Bazar More Under Command Area Of Kanksa Zone Ii/Pt C Distribution Main By Modern Treanche Less Technology Through Jack Pushing
|
| Description |
Na
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_PHED_527521_23 |
|
Reference Number |
03/2023-2024/EE/DWSD/PHE Dte |
| Tender Fee | |
| EMD | 21841 |
| Tender Value | |
| Place | Office of the EE_DWSD_PHE Dte_Durgapur-12 |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | June 14, 2023 20:00 |
| End Date |
Expired
03/07/2023
Expired 1085 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
1(one) no pwd road crosssing sh-34 at mini bazar more under command area of kanksa zone-ii/pt-c distribution main by modern treanche less technology through jack pushing
Na
Read more1(one) no pwd road crosssing at bistupur under command area of bistupur distribution main by modern treanche less technology through jack pushing method
Na
Read more1(one) no pwd road crosssing sh-34 at kanksa underpass under command area of kanksa zone-ii/pt-c distribution main by modern treanche less technology through jack pushing method under augmentation of kanksa zone-ii/part-c piped w/s scheme under dws
Na
Read more1(one) no pwd road crosssing sh-34 at kanksa underpass under command area of kanksa zone-ii/pt-c distribution main by modern treanche less technology through jack pushing method under augmentation of kanksa zone-ii/part-c piped w/s scheme under dws
Na
Read more1(one) no pwd road crosssing at jamdoba under command area of telipara distribution main by modern treanche less technology through jack pushing method under augmentation of telipara piped w/s scheme under dwsd ,phe dte (part-c)
Na
Read more1(one) no pwd road crosssing at bistupur under command area of bistupur distribution main by modern treanche less technology through jack pushing method note- 46 and node point 64,65 under augmentation of bistupur piped w/s scheme under dwsd ,phe
Na
Read moreLaying pushing of 800 mm dia rcc (np3) hume pipe by adopting trench less technology (e.g. jack pushing method etc.) at amdiha more towards itapara village surrounding area (zone-ix) under improvement of rcfa part-i pwss under rcfa division-i phe dt
Laying pushing of 800 mm dia rcc (np3) hume pipe by adopting trench less technology (e.g. jack pushing method etc.) at amdiha more towards itapara village surrounding area (zone-ix) under improvement of rcfa part-i pwss under rcfa division-i phe dt
Read moreAdditional work for laying ms pipe and allied works including adopting trench less technology (e.g. jack pushing method etc) at amnala irrigation damp within command area of zone-ix part-i distribution system under improvement of rcfa part-i pwss und
Additional work for laying ms pipe and allied works including adopting trench less technology (e.g. jack pushing method etc) at amnala irrigation damp within command area of zone-ix part-i distribution system under improvement of rcfa part-i pwss und
Read moreTrial and special maintenance of rising main and distribution system with operating of valve within command area under augmentation of kanksa zone-ii(part-a )pwss, jjm under rcfa division-i phe dte. w.e.f from 01/02/2024 to 31/07/2024
Trial and special maintenance of rising main and distribution system with operating of valve within command area under augmentation of kanksa zone-ii(part-a )pwss, jjm under rcfa division-i phe dte. w.e.f from 01/02/2024 to 31/07/2024
Read moreAdditional laying of 600 mm dia rcc np 3 hume pipe by modern hydraulic jack pushing mehtod including laying 150 mm dia ms pipe at dvc more over suri road nh-60 for rob under augmentation of rcfa part-iii(zone-ii) piped w/s scheme under dwsd ,phe dte
Additional laying of 600 mm dia rcc np 3 hume pipe by modern hydraulic jack pushing mehtod including laying 150 mm dia ms pipe at dvc more over suri road nh-60 for rob under augmentation of rcfa part-iii(zone-ii) piped w/s scheme under dwsd ,phe dte
Read moreof your Industry type