Tender Details

Particulars Details
Title
Providing Cover Slab Over The Krishna Nagar Phase Ii Drain Between Anna Malaiyar Veethy And Suthanthira Ponvizha Nagar, Puducherry.
Description
Providing Cover Slab Over The Krishna Nagar Phase Ii Drain Between Anna Malaiyar Veethy And Suthanthira Ponvizha Nagar, Puducherry.
Organisation Government of Puducherry
Tender Id 2023_PWDC2_14083_1
Reference
Number
64/PW/IRRN/2023-2024
Tender Fee 525
EMD 90043
Tender Value -
Place O/o The Executive Engineer, ID., PWD., Puducherry.
Link
View Original Tender Notice

https://pudutenders.gov.in

Start Date October 26, 2023 16:45
End Date
Expired 09/11/2023

Expired 1071 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Providing slab cover over drain for safe drain crossing at various

Providing slab cover over drain for safe drain crossing at variouslocations inside pvunl plant

Read more
Providing cover slab in the krishna nagar phase-iv drain from mariamman koil street to rear side of jayaram nagar at new saram, chinnaiyanpet, thattanchavady constituency, puducherry - (ii call).

Providing cover slab in the krishna nagar phase-iv drain from mariamman koil street to rear side of jayaram nagar at new saram, chinnaiyanpet, thattanchavady constituency, puducherry - (ii call).

Read more
Construction of rcc cover slab over existing major rcc drain at ranir bazar under ranir bazar municipal council under rd jirania division fy- 2026-27

Construction of rcc cover slab over existing major rcc drain at ranir bazar under ranir bazar municipal council under rd jirania division fy- 2026-27

Read more
Design, supply, erection testing and commissioning of 25 kv, single phase, ac ohe works in connection with provision of cover over shed (cop) end to end platform (5270 sqm) at niphad railway station.

Design, supply, erection testing and commissioning of 25 kv, single phase, ac ohe works in connection with provision of cover over shed (cop) end to end platform (5270 sqm) at niphad railway station.

Read more
Bza division - 1) provision of divyangjan facilities at way side stations in sse/ works/ tuni section under aden/ tuni sub-division; 2) bza-vskp section:- provision of water supply system & ro plants between chebrolu-duvvada stations; 3) glu, reg,nasp;- construction of irs type pf shelters on pf no. 1,2&3 in sse/w/tuni section; 4) provision of cover over platform shelters of irs type on platform 1,2&3 at anv in aden/ slo sub division; 5) provision of cover over platform shelters of

Bza division - 1) provision of divyangjan facilities at way side stations in sse/ works/ tuni section under aden/ tuni sub-division; 2) bza-vskp section:- provision of water supply system & ro plants between chebrolu-duvvada stations; 3) glu, reg,nasp;- construction of irs type pf shelters on pf no. 1,2&3 in sse/w/tuni section; 4) provision of cover over platform shelters of irs type on platform 1,2&3 at anv in aden/ slo sub division; 5) provision of cover over platform shelters of

Read more
Left over works of supply, fabrication and launching of girders (2x24.40 cg + 1x106.70m owg) of br. no.756, launching of psc slab (6x6.10m) and protection work of br. no. 750, drain between up and dn main line, km 170/0-173/0 and other ancillary works, in aza-kyq section in c/with nbq-glpt-kyq dl project

Left over works of supply, fabrication and launching of girders (2x24.40 cg + 1x106.70m owg) of br. no.756, launching of psc slab (6x6.10m) and protection work of br. no. 750, drain between up and dn main line, km 170/0-173/0 and other ancillary works, in aza-kyq section in c/with nbq-glpt-kyq dl project

Read more
1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.

1. salem division: rebuilding of 3 nos ( br.no.sge-40,sge-43 and sge-47) of rcc slab aqueduct / rob in ed-sge section.2. salem division - erode - karur section- proposed construction of road over bridge in lieu of existing lc no: 5 at km 5/400-500 1x36.0m effective span composite girder between erode and pasur stations along with pedestrian subway.

Read more
Providing rcc cover slab arrangements at heber road to ponvizha nagar in ward no51

Providing rcc cover slab arrangements at heber road to ponvizha nagar in ward no 51

Read more
Construction of cover slab over drain

Construction of cover slab over drain connected&amp#x0d h/o nokhil kundu and sima kundu in ward no.2

Read more
Providing r.c.c cover slab over pudu nagar drain in aravindar nagar 1st cross to aravindar nagar 2nd cross near ajiz nagar main road at reddiyarpalam, puducherry-(iv call).

Providing r.c.c cover slab over pudu nagar drain in aravindar nagar 1st cross to aravindar nagar 2nd cross near ajiz nagar main road at reddiyarpalam, puducherry-(iv call).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise