Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of Spares, Dismantling, Erection And Commissioning On Turnkey (Epc) Basis Of Damaged Esp Pass A Of Unit 11, 5x200 Mw, Btps, Obra.
|
| Description |
Supply Of Spares, Dismantling, Erection And Commissioning On Turnkey (Epc) Basis Of Damaged Esp Pass A Of Unit 11, 5x200 Mw, Btps, Obra.
|
| Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
| Tender Id | 2024_RVUNL_971615_1 |
|
Reference Number |
03 SE O and MC-I 3x200MW AHD-I 2024-25 |
| Tender Fee | 5900 |
| EMD | 31 Lakh |
| Tender Value | - |
| Place | OTPS, Obra |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1700789 |
| Start Date | November 07, 2024 20:30 |
| End Date |
Expired
02/12/2024
Expired 685 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - half yearly maintenance contract for ash disposal pipeline and ash water recirculation pipeline of 5x200mw btps obra power house equipment service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - half yearly maintenance contract for ash disposal pipeline and ash water recirculation pipeline of 5x200mw btps obra power house equipment service provider
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - restoration of four esp fields 1a1 1a2 1b1 and 1b2 of unit 10 3x200mw btps obra power house equipment service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - restoration of four esp fields 1a1 1a2 1b1 and 1b2 of unit 10 3x200mw btps obra power house equipment service provider
Read moreDismantling, fabrication and erection of esp casing plate patch-up work in power boiler # 6 in energy mechanical at tnpl unit-1
Dismantling, fabrication and erection of esp casing plate patch-up work in power boiler # 6 in energy mechanical at tnpl unit-1
Read moreElectro mechanical works of 3x4 mw tankul shp including detailed design, engineering, manufacture, supply, erection, testing, commissioning and other associated works on epc engineering procurement and construction turnkey basis
Electro mechanical works of 3x4 mw tankul shp including detailed design, engineering, manufacture, supply, erection, testing, commissioning and other associated works on epc engineering procurement and construction turnkey basis
Read moreTtps mech ii bm unit i replacement of damaged bottom plate corroded portion of side plate including supply fabrication dismantling and erection of cst tank in unit i boiler
Ttps mech ii bm unit i replacement of damaged bottom plate corroded portion of side plate including supply fabrication dismantling and erection of cst tank in unit i boiler
Read moreDismantling of 6 no. damaged pole and re-erection of 6 no. pole and erection 550 mtrs cradle guard in the 3 wire 550v overhead line from 5 pit sub-station to jeenagora weigh bridge of amal. joyrampur colliery under lodna area..
Dismantling of 6 no. damaged pole and re-erection of 6 no. pole and erection 550 mtrs cradle guard in the 3 wire 550v overhead line from 5 pit sub-station to jeenagora weigh bridge of amal. joyrampur colliery under lodna area..
Read moreErection of lt and ht metallic electrical poles with overhead lines and other required ohl structures at different locations along with dismantling of lt and ht poles, ohl and other ohl structures damaged during thundering, tree felling, heavy rains
Erection of lt and ht metallic electrical poles with overhead lines and other required ohl structures at different locations along with dismantling of lt and ht poles, ohl and other ohl structures damaged during thundering, tree felling, heavy rains
Read moreEstablishing 2x20mva, 110/11kv sub-station at jammaladinni(devara hulagabal) along with construction of 110kv dc line from one of the circuits of proposed 110kv basarkod(220kv)-talikoti dc line for a distance of 3.27kms in muddebihal taluk, vijayapura district on partial turnkey basis including supply of all matching materials/equipments (excluding supply 11kv switchgear) and erection (including dismantling and civil works) of all materials/ equipment, testing and commissioning
Establishing 2x20mva, 110/11kv sub-station at jammaladinni(devara hulagabal) along with construction of 110kv dc line from one of the circuits of proposed 110kv basarkod(220kv)-talikoti dc line for a distance of 3.27kms in muddebihal taluk, vijayapura district on partial turnkey basis including supply of all matching materials/equipments (excluding supply 11kv switchgear) and erection (including dismantling and civil works) of all materials/ equipment, testing and commissioning.
Read moreEstablishment of 2x20mva, 110/11kv sub-station at kannalli along with construction of 110kv lilo line using lynx conductor from existing 110kv kembhavi-hunasagi sc line to the proposed 110/11kv kannalli sub-station for a distance of 10.685km in hunasagi taluk, yadgir district on partial turnkey basis including supply of all matching materials/equipments (excluding supply 11kv switchgear) and erection (including dismantling and civil works) of all materials/ equipment, testing and commissioning.
Establishment of 2x20mva, 110/11kv sub-station at kannalli along with construction of 110kv lilo line using lynx conductor from existing 110kv kembhavi-hunasagi sc line to the proposed 110/11kv kannalli sub-station for a distance of 10.685km in hunasagi taluk, yadgir district on partial turnkey basis including supply of all matching materials/equipments (excluding supply 11kv switchgear) and erection (including dismantling and civil works) of all materials/ equipment, testing and commissioning.
Read moreMobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read moreof your Industry type