Tender Details
Particulars | Details |
---|---|
Title |
Virar Surat Section Electrical (Power) Work In Connection With Improvement To Existing Staff Quarters Under Jurisdiction Of Aden/Drd. (Type Ii 300 Nos.)
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79948797 |
Reference Number |
EL-81-886-WA-67 |
Tender Fee | 0 |
EMD | 46000 |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/032025/79948797/viewNitPdf_4855777.pdf |
Start Date | February 07, 2025 22:47 |
End Date |
17/03/2025 ( Expired 35 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read moreReplacement of 6 nos. existing narrow-poor minor bridge-culvert by suitable waterways structure with provision of temp. di etc. and raising of embankment ... in between km 610.00 to km 626.00 of nh-31 i the dist. of jalpaiguri, job no.566.
Replacement of 6 nos. existing narrow-poor minor bridge-culvert by suitable waterways structure with provision of temp. di etc. and raising of embankment ... in between km 610.00 to km 626.00 of nh-31 i the dist. of jalpaiguri, job no.566.
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreRewiring of 80 nos old type iii b quarters in donimalai township phase ii
Rewiring of 80 nos old type iii b quarters in donimalai township phase ii
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreConstruction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Read moreRepair of rehabilitation and upgradation of digras darwha karanja section in (km 0.000 to 74.351) nh 361c two lanes with paved shoulder configuration in the state of maharashtra.(under risk and cost).
Repair of rehabilitation and upgradation of digras darwha karanja section in (km 0.000 to 74.351) nh 361c two lanes with paved shoulder configuration in the state of maharashtra.(under risk and cost).
Read moreof your Industry type