Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Civil Work In Substructure, Superstructure,Deck Slab, Crash Barrier,Bridge Protection Work,Other Allied Work Etc,In Connection With Reconstruction Of A Double Lane Permanent Steel Bridge With Span Length 132 M And Carriage Width 7.5 M Across Teestar
|
| Description |
Civil Work In Substructure, Superstructure,Deck Slab, Crash Barrier,Bridge Protection Work,Other Allied Work Etc,In Connection With Reconstruction Of A Double Lane Permanent Steel Bridge With Span Length Plus132 M And Carriage Width 7.5 M Across Teesta
|
| Organisation | Bridge and Roof Company (India) Limited | Central Govt. Ministry/Department |
| Tender Id | 2024_BandR_830022_1 |
|
Reference Number |
B AND R/HO/30657/TD/CIVIL WORK/01 |
| Tender Fee | 8330 |
| EMD | 7.06 Lakh |
| Tender Value | - |
| Place | TARKHOLA, KALIMPONG, WB AND PAMHOK, SIKKIM |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=872205 |
| Start Date | October 09, 2024 23:00 |
| End Date |
Expired
29/10/2024
Expired 712 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Reconstruction work of the footbridge completely damaged by the disaster at tok manigair, village paisari under sdrf 2025-26 (substructure and superstructure). superstructure span length- 33 mtr
Reconstruction work of the footbridge completely damaged by the disaster at tok manigair, village paisari under sdrf 2025-26 (substructure and superstructure). superstructure span length- 33 mtr
Read moreReconstruction work of the footbridge completely damaged by the disaster at tok jagthanabgad of village baisani under sdrf 2025-26 (substructure and superstructure). superstructure span length- 33 mtr
Reconstruction work of the footbridge completely damaged by the disaster at tok jagthanabgad of village baisani under sdrf 2025-26 (substructure and superstructure). superstructure span length- 33 mtr
Read moreReconstruction work of the footbridge completely damaged by the disaster at tok chiranibagd of village kanyalikot under sdrf 2025-26. (substructure and superstructure) superstructure span length- 42 mtr .
Reconstruction work of the footbridge completely damaged by the disaster at tok chiranibagd of village kanyalikot under sdrf 2025-26. (substructure and superstructure) superstructure span length- 42 mtr&#x0d .&#x0d
Read moreCosntruction of 24.00 meter span span rcc bridge over river kawalta tehsil jubbal distt.shimla h.p sh co sub structure and superstructure of bridge
Cosntruction of 24.00 meter span span rcc bridge over river kawalta tehsil jubbal distt.shimla h.p sh co sub structure and superstructure of bridge
Read moreCosntruction of 24.00 meter span span rcc bridge over river kawalta tehsil jubbal distt.shimla h.p sh co sub structure and superstructure of bridge
Cosntruction of 24.00 meter span span rcc bridge over river kawalta tehsil jubbal distt.shimla h.p sh co sub structure and superstructure of bridge
Read moreCosntruction of 24.00 meter span span rcc bridge over river kawalta tehsil jubbal distt.shimla h.p sh co sub structure and superstructure of bridge
Cosntruction of 24.00 meter span span rcc bridge over river kawalta tehsil jubbal distt.shimla h.p sh co sub structure and superstructure of bridge
Read moreCosntruction of 24.00 meter span span rcc bridge over river kawalta tehsil jubbal distt.shimla h.p sh co sub structure and superstructure of bridge
Cosntruction of 24.00 meter span span rcc bridge over river kawalta tehsil jubbal distt.shimla h.p sh co sub structure and superstructure of bridge
Read moreConstruction of bamboo foot bridge foundation and substructure 60m span at khadipada vp katri tal- dhadgaon dist- nandurbar
Construction of bamboo foot bridge foundation and substructure 60m span at khadipada vp katri tal- dhadgaon dist- nandurbar
Read moreDemolition and reconstruction of existing superstructure and major repairs to the substructure of oshiwara nalla bridge along link road in p-s ward
Demolition and reconstruction of existing superstructure and major repairs to&#x0d the substructure of oshiwara nalla bridge along link road in p-s ward
Read moreBalance work of 3 nos. major bridges in rcc substructure for bridge no. 166 span (10x30.50 m composite girder), br. no. 168 span (6x30.50 m composite girder) & br. no. 171 span (8x30.5m composite girder) and construction of 6 nos. major bridges on pile foundation in rcc substructure & superstructure as per rdso s drawing for br. no. 175 span (1x30.50 m composite girder), br. no. 179 span (1x30.50 m composite girder), br. no. 181 span (1x18.30 m composite girder), br. no. 183 span
For complete deion and other details, please refer to tender
Read moreof your Industry type