Tender Details

Particulars Details
Title
Construction Of Rcc Garland Drain At Ob Dump Rehab Site Under Rajmahal Area.
Description
Construction Of Rcc Garland Drain At Ob Dump Rehab Site Under Rajmahal Area.
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_ECL_301685_1
Reference
Number
ECL/RJML/GM/AE(C)/23-24/841 Dt-16.02.2024
Tender Fee 0
EMD 24700
Tender Value -
Place OB dump rehab site under Rajmahal Area.
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=312519

Start Date February 17, 2024 17:30
End Date
Expired 27/02/2024

Expired 961 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area

Construction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area

Read more
Oil testing of lighting transformer 6.6kv/440v, 50hz, 3-phase different places of lalmatia sub-station project affected village and rehab sites of rajmahal ocp.

Oil testing of lighting transformer 6.6kv/440v, 50hz, 3-phase different places of lalmatia sub-station project affected village and rehab sites of rajmahal ocp.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl

Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl

Read more
Supply and stacking of different size aggregates and sand at km 73.00 hmp site and at km 120.00 hmp site on oksrt road for spill over resurfacing work during 2026-27 under 91 rcc 14 brtf project vartak -retender 02nd call

Supply and stacking of different size aggregates and sand at km 73.00 hmp site and at km 120.00 hmp site on oksrt road for spill over resurfacing work during 2026-27 under 91 rcc 14 brtf project vartak -retender 02nd call

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Construction of rcc garland drain near jamayi tola at ob dump rehab site under rajmahal area.

Construction of rcc garland drain near jamayi tola at ob dump rehab site under rajmahal area.

Read more
Construction of rcc main garland drain near jamayi tola at ob dump rehab site under rajmahal area.

Construction of rcc main garland drain near jamayi tola at ob dump rehab site under rajmahal area.

Read more
Construction of chabutra at ob dump rehab site under rajmahal area.

Construction of chabutra at ob dump rehab site under rajmahal area.

Read more
Construction of rcc retaining/protection wall around kabristan at ob dump rehab site under rajmahal area.

Construction of rcc retaining/protection wall around kabristan at ob dump rehab site under rajmahal area.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise