Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Rcc Garland Drain At Ob Dump Rehab Site Under Rajmahal Area.
|
| Description |
Construction Of Rcc Garland Drain At Ob Dump Rehab Site Under Rajmahal Area.
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_ECL_301685_1 |
|
Reference Number |
ECL/RJML/GM/AE(C)/23-24/841 Dt-16.02.2024 |
| Tender Fee | 0 |
| EMD | 24700 |
| Tender Value | - |
| Place | OB dump rehab site under Rajmahal Area. |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=312519 |
| Start Date | February 17, 2024 17:30 |
| End Date |
Expired
27/02/2024
Expired 961 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area
Construction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area
Read moreOil testing of lighting transformer 6.6kv/440v, 50hz, 3-phase different places of lalmatia sub-station project affected village and rehab sites of rajmahal ocp.
Oil testing of lighting transformer 6.6kv/440v, 50hz, 3-phase different places of lalmatia sub-station project affected village and rehab sites of rajmahal ocp.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreTender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Read moreSupply and stacking of different size aggregates and sand at km 73.00 hmp site and at km 120.00 hmp site on oksrt road for spill over resurfacing work during 2026-27 under 91 rcc 14 brtf project vartak -retender 02nd call
Supply and stacking of different size aggregates and sand at km 73.00 hmp site and at km 120.00 hmp site on oksrt road for spill over resurfacing work during 2026-27 under 91 rcc 14 brtf project vartak -retender 02nd call
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreConstruction of rcc garland drain near jamayi tola at ob dump rehab site under rajmahal area.
Construction of rcc garland drain near jamayi tola at ob dump rehab site under rajmahal area.
Read moreConstruction of rcc main garland drain near jamayi tola at ob dump rehab site under rajmahal area.
Construction of rcc main garland drain near jamayi tola at ob dump rehab site under rajmahal area.
Read moreConstruction of chabutra at ob dump rehab site under rajmahal area.
Construction of chabutra at ob dump rehab site under rajmahal area.
Read moreConstruction of rcc retaining/protection wall around kabristan at ob dump rehab site under rajmahal area.
Construction of rcc retaining/protection wall around kabristan at ob dump rehab site under rajmahal area.
Read moreof your Industry type