Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing Scaffolding For Water Wall Tubes, Super Heater And Bank Tubes Of Power Boiler #1 To 6 At Energy Process
|
| Description |
Providing Scaffolding For Water Wall Tubes, Super Heater And Bank Tubes Of Power Boiler #1 To 6 At Energy Process
|
| Organisation | Tamilnadu Newsprint and Papers Limited | State Govt. and UT |
| Tender Id | 2025_TNPL_524870_1 |
|
Reference Number |
TNPL / TOS / U1/242513006291 |
| Tender Fee | 0 |
| EMD | 10000 |
| Tender Value | - |
| Place | TOS Kagithapuram |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=624875 |
| Start Date | February 15, 2025 00:10 |
| End Date |
Expired
27/02/2025
Expired 598 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Supply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Read moreBoiler#5 start up and super heater safety valve work
Boiler#5 start up and super heater safety valve work
Read moreProcurement of boiler tubes for unit#5 overhauling,ktps
Procurement of boiler tubes for unit#5 overhauling,ktps
Read moreSupply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler
Supply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler
Read moreBoiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Read moreOt 14 removing and refixing the cassette baffle from low temperature super heater ltsh
Removing and refixing the cassette baffle from low temperature super heater ltsh upper bank coils and low temperature reheater ltrh lower bank coils shrouding plates from various places of boiler tubes such that hra fsh and frh
Read moreProviding scaffolding and surface preparation for carrying out rla study in boiler 6 at energy - mechanical in tnpl unit-i
Providing scaffolding and surface preparation for carrying out rla study in boiler 6 at energy - mechanical in tnpl unit-i
Read moreTtps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2
Ttps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2
Read moreCleaning of tubes in evaporators, pre heaters and condenser etc at srp process in tnpl unit i
Cleaning of tubes in evaporators, pre heaters and condenser etc at srp process in tnpl unit i
Read moreof your Industry type