Tender Details

Particulars Details
Title
Extension/ Erection Of Lt Overhead Line (Approx. Route Length For Erection/ Extension Is 1200m And N Dismantling Of Lt Line (Approx. Route Length For Dismantling Is 600 Mtr) For A Period Of Six Months (180 Days) On As When And Where Required Basis
Description
Extension/ Erection Of Lt Overhead Line (Approx. Route Length For Erection/ Extension Is 1200m And N Dismantling Of Lt Line (Approx. Route Length For Dismantling Is 600 Mtr) For A Period Of Six Months (180 Days) On As When And Where Required Basis
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_333288_1
Reference
Number
GM(R)/ SO(ENM)/Rjp/24-25/Et/161 dt 26.03.25
Tender Fee 0
EMD 11900
Tender Value
Place RAJRAPPA
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345503
Start Date March 27, 2025 23:30
End Date

05/04/2025 ( Expired 16 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Day to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .

Day to day erection, reorganization, dismantling, shifting of 6.6kv and 3.3 kv ht overhead line ht cable at chhal ocm for a period of 01 year (365 days) at chhal ocm secl raigarh area .

Read more
Maintenance and erection and dismantling of 440/220 volt lighting overhead (oh) line before monsoon for proper maintenance of critical location lt overhead lines under tetariakhar ocp, rajhara area.

Maintenance and erection and dismantling of 440/220 volt lighting overhead (oh) line before monsoon for proper maintenance of critical location lt overhead lines under tetariakhar ocp, rajhara area.

Read more
Rate contract for supply, erection, testing , commissioning for 1 km lt line on 8 mtr. pcc pole and st pole of 3 phase 4 wire, 2 phase 3 wire, 1 phase 2 wire on weasel conductor under ed-i on turnkey basis for fy 2025-26

Rate contract for supply, erection, testing , commissioning for 1 km lt line on 8 mtr. pcc pole and st pole of 3 phase 4 wire, 2 phase 3 wire, 1 phase 2 wire on weasel conductor under ed-i on turnkey basis for fy 2025-26

Read more
Di /extension and dismantling of 6.6 kv power line of western part on as and when required basis for quarry section at gevra project for a period of 365 days

Di /extension and dismantling of 6.6 kv power line of western part on as and when required basis for quarry section at gevra project for a period of 365 days

Read more
Extension/ erection of lt overhead line (approx. route length for erection/ extension is 1200m and n dismantling of lt line (approx. route length for dismantling is 600 mtr) for a period of six months (180 days) on as when and where required basis

Extension/ erection of lt overhead line (approx. route length for erection/ extension is 1200m and n dismantling of lt line (approx. route length for dismantling is 600 mtr) for a period of six months (180 days) on as when and where required basis

Read more
Work of di/extension and dismantling of lt overhead line of eastern part i.e. bramhaputra, 223, bahanpat, bhatora patch, naraibodh patch of mines on as and when required basis for quarry at gevra project for a period of 365 days.

Work of di/extension and dismantling of lt overhead line of eastern part i.e. bramhaputra, 223, bahanpat, bhatora patch, naraibodh patch of mines on as and when required basis for quarry at gevra project for a period of 365 days.

Read more
T,e,t comm of 33/6.6kv electrical substation including existing 4 nos of 3150kva power transformers, electrical panels, cabels, 33kv overhead line and all allied equipment to feed the power supply to emergency pumping arrangements at foreshore of nagarjuna sagar near puttamgandi including 4 months mom for substation, dismantling and transportation of all equipment to kpur, npally and gkondla whenever sufficient inflows ed to nagarjunasagar reservoir under eam section, om div.xi, saheb

Transportation, erection, testing and commissioning of 33/6.6 kv electrical substation including existing 4 no of 3150kva power transformers, electrical panels, cables, 33kv over head line and all allied electrical equipement to feed the power supply to emergency pumping arrangements at foreshore of nagarjuna sagar near puttamgandi including 4 months mom for substation, dismantling and transportation of all equipment to kodandapur, nasarlapally and godakondla whenever sufficient inflows ed to nagarjunasagar reservoir, under eam section, electrical sub division,transmission div.iii, sahebnagar

Read more
Day to day shifting , reorganizing , dismantling and erection of lt overhead line for a period of 01 year (365 days) at baroud ocm, secl raigarh area.

Day to day shifting , reorganizing , dismantling and erection of lt overhead line for a period of 01 year (365 days) at baroud ocm, secl raigarh area.

Read more
For hiring light motor diesel vehicle (along with driver) on monthly rent basis for the use of ee and ae-i, ii and iii, under eudd-11 kv south and lt line, meerut., for the period of 01.04.2025 to 31.03.2026 (12 months).

For hiring light motor diesel vehicle (along with driver) on monthly rent basis for the use of ee and ae-i, ii and iii, under eudd-11 kv south and lt line, meerut., for the period of 01.04.2025 to 31.03.2026 (12 months).

Read more
Shifting , re-organization , dismantling and erection of lt overhead line for a period of 02 years at jampali ocm , secl raigarh area .

Shifting , re-organization , dismantling and erection of lt overhead line for a period of 02 years at jampali ocm , secl raigarh area .

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise