Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Itarsi Jabalpur : Construction Of Lhs In Lieu Of Manned Lc No. 286 With Approach Shed, Pumping Arrangement And Drainage System
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 77042223 |
|
Reference Number |
DRMW-JBP-126-2024 |
| Tender Fee | 0 |
| EMD | 3.12 Lakh |
| Tender Value | - |
| Place | Jabalpur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/092024/77042223/viewNitPdf_4691870.pdf |
| Start Date | August 26, 2024 16:53 |
| End Date |
Expired
20/09/2024
Expired 756 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of new lhs in lieu of lc gate no. 26 by railway s relieving girder under aen/bdc
Construction of new lhs in lieu of lc gate no. 26 by railway s relieving girder under aen/bdc
Read more(i)construction of new lhs in lieu of lc gate no. 24/02 by railway s relieving girder under aen/kwae.(ii)construction of new lhs in lieu of lc gate no. 21 at km 22/9-11 in az-nht section under aen/az. (iii)construction of new lhs in lieu of lc gate no. 22 at km 20 / 34-36 in az-nht section under aen/az.
(i)construction of new lhs in lieu of lc gate no. 24/02 by railway s relieving girder under aen/kwae.(ii)construction of new lhs in lieu of lc gate no. 21 at km 22/9-11 in az-nht section under aen/az. (iii)construction of new lhs in lieu of lc gate no. 22 at km 20 / 34-36 in az-nht section under aen/az.
Read more(i) construction of new lhs in lieu of lc gate no. 18/4 at km 88/7-9 in bdc - kwae section under aen/kwae. (ii)construction of new lhs in lieu of lc gate no. 28 at km 14 / 39 - 41 at az-nht section under aen/az. (iii) construction of new lhs in lieu of lc gate no. 32 at km 9/23-25 in az-nht section under aen/az.
(i) construction of new lhs in lieu of lc gate no. 18/4 at km 88/7-9 in bdc - kwae section under aen/kwae. (ii)construction of new lhs in lieu of lc gate no. 28 at km 14 / 39 - 41 at az-nht section under aen/az. (iii) construction of new lhs in lieu of lc gate no. 32 at km 9/23-25 in az-nht section under aen/az.
Read moreConstruction of rub/lhs in lieu of lc no. 351 at km.688/25-27 between nia-akt under the jurisdiction of aden/central, bilaspur.
Construction of rub/lhs in lieu of lc no. 351 at km.688/25-27 between nia-akt under the jurisdiction of aden/central, bilaspur.
Read more(i) construction of new lhs in lieu of lc gate no. 18/4 at km 88/7-9 in bdc - kwae section under aen/kwae. (ii)construction of lhs in lieu of lc gate no. 18/6/c/e at km 89/21-23 and 89/24-22 (dn) in between station ptae-agae in bb loop under aen/kwae.(iii) construction of new lhs in lieu of lc gate no. 18/7/c/e at km 91/7-9 in bdc - kwae section under aen/kwae
(i) construction of new lhs in lieu of lc gate no. 18/4 at km 88/7-9 in bdc - kwae section under aen/kwae. (ii)construction of lhs in lieu of lc gate no. 18/6/c/e at km 89/21-23 and 89/24-22 (dn) in between station ptae-agae in bb loop under aen/kwae.(iii) construction of new lhs in lieu of lc gate no. 18/7/c/e at km 91/7-9 in bdc - kwae section under aen/kwae
Read moreConducting feasibility study, investigation, detailed survey and detailed project report preparation and detailed design work in connection with elimination of level crossings by constructing 09 robs on following level crossings on jabalpur division of wcr.1) itarsi - jabalpur section 03 nos ( lc no. 285, 305 & 309) (2) jabalpur - manikpur section - 02 nos (lc no. 328 & 340) (3) katni - singrauli section - 02 nos (lc no. 67 & 88) (4) katni - satna section - 02 nos (one common ro
Conducting feasibility study, investigation, detailed survey and detailed project report preparation and detailed design work in connection with elimination of level crossings by constructing 09 robs on following level crossings on jabalpur division of wcr.1) itarsi - jabalpur section 03 nos ( lc no. 285, 305 & 309) (2) jabalpur - manikpur section - 02 nos (lc no. 328 & 340) (3) katni - singrauli section - 02 nos (lc no. 67 & 88) (4) katni - satna section - 02 nos (one common ro
Read moreProvision of lhs 2.00 x 5.00 m x 5.00 m in lieu of lc no. b-58 at km 78/8-9 on the asr-ptk section under aden/ptk
Provision of lhs 2.00 x 5.00 m x 5.00 m in lieu of lc no. b-58 at km 78/8-9 on the asr-ptk section under aden/ptk
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreRehabilitation, special strengthening and repair of bridges work. (package-1 bhopal) (i) special strengthening of rob in lieu of lc 237 budhni, dist sehore (ii) renewal/strengthening of approach road high level bridge across narmada river near anwali
Rehabilitation, special strengthening and repair of bridges work. (package-1 bhopal)
Read moreConstruction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Read moreof your Industry type