Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of Water Wall Rifled Tube Panel For 600 Mw Unit I Boiler Rear Side
|
| Description |
Procurement Of Water Wall Rifled Tube Panel For 600 Mw Unit I Boiler Rear Side
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2026_EB_676723_1 |
|
Reference Number |
CE-02/2026-27/NCTPS-II |
| Tender Fee | 0 |
| EMD | 1.58 Lakh |
| Tender Value | - |
| Place | NCTPS II |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=813145 |
| Start Date | May 12, 2026 21:00 |
| End Date |
Expired
19/05/2026
Expired 149 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Expression of interest for enlistment of industrial water tube boiler package (item category-06bb) for industrial water tube boiler package
Expression of interest for enlistment of industrial water tube boiler package (item category-06bb) for industrial water tube boiler package
Read moreSupply of boiler tube protection shielding for economiser zone in boiler of 2x660 mw, csctpp,chhabra
Supply of boiler tube protection shielding for economiser zone in boiler of 2x660 mw, csctpp,chhabra
Read moreNdt of critical tube and pipings of boiler area at pvunl during
Ndt of critical tube and pipings of boiler area at pvunl duringoverhauling
Read moreTtps mech ii bm unit i replacement of boiler pressure parts tubes bends in screen tube and coutant bottom area in unit i boiler
Ttps mech ii bm unit i replacement of boiler pressure parts tubes bends in screen tube and coutant bottom area in unit i boiler
Read moreVz9700006123 so 8136 1st boiler,vz9700006131 so 8136 1st boiler,e and c so 8136 1st boiler,vz9700006123 so 8194 2nd boiler,vz9700006131 so 8194 2nd boiler,e and c so 8194 2nd boiler,vz9700006123 so 8195 3rd boiler,vz9700006131 so 8195 3rd boiler,e and c so 8195 3rd boiler
Vz9700006123 so 8136 1st boiler,vz9700006131 so 8136 1st boiler,e and c so 8136 1st boiler,vz9700006123 so 8194 2nd boiler,vz9700006131 so 8194 2nd boiler,e and c so 8194 2nd boiler,vz9700006123 so 8195 3rd boiler,vz9700006131 so 8195 3rd boiler,e and c so 8195 3rd boiler
Read moreRemoval of technological waste from boiler furnace seal area, cpp dry ash silo system area including compressor and panel room, seal air blower room and air compressor room of cpp boiler
Removal of technological waste from boiler furnace seal area, cpp dry ash silo system area including compressor and panel room, seal air blower room and air compressor room of cpp boiler
Read moreProcurement of economizer bends tube used at economizer modules repairing and unit-6 boiler overhauling under bm dept. stps,wbpdcl.
Procurement of economizer bends tube used at economizer modules repairing and unit-6 boiler overhauling under bm dept. stps,wbpdcl.
Read moreSupply of boiler chemical for boiler feed water as per boiler norms to maintain results in all respect
Supply of boiler chemical for boiler feed water as per boiler norms to maintain results in all respect
Read moreof your Industry type