Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Strengthening Of Steel Structure And Dismantling, Fabrication And Erection Of Steel Structure Of Belt Conveyor Bc 3 And Bc 4 Of Bottom Ash Handling System Unit1 And 2, Ctpp, Chhabra
|
| Description |
Strengthening Of Steel Structure And Dismantling, Fabrication And Erection Of Steel Structure Of Belt Conveyor Bc 3 And Bc 4 Of Bottom Ash Handling System Unit1 And 2, Ctpp, Chhabra
|
| Organisation | RRVUN - CMD | State Govt. and UT |
| Tender Id | 2025_RRVUN_447021_1 |
|
Reference Number |
622/2024-25/SE(CA-I)/CTPP |
| Tender Fee | 1090 |
| EMD | 19200 |
| Tender Value | - |
| Place | CHHABRA THERMAL PWOER PLANT, CHHABRA |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=802540 |
| Start Date | February 12, 2025 18:30 |
| End Date |
Expired
19/02/2025
Expired 603 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Requirement of m/s fluidomat make fluid coupling sc-10 (scoop control) and its spares installed at ash slurry pump of bottom ash handling system unit 5 and 6, csctpp, chhabra for f. y. 2026-27
Requirement of m/s fluidomat make fluid coupling sc-10 (scoop control) and its spares installed at ash slurry pump of bottom ash handling system unit 5 and 6, csctpp, chhabra for f. y. 2026-27
Read moreDesign, engineering, manufacturing, supply and etc of 50 mva, 400/6.9/6.9 kv station transformer and dismantling and shifting of existing heil make 50 mva, 400/6.9/6.9 kv station transformer at ctpp, chhabra
Design, engineering, manufacturing, supply and etc of 50 mva, 400/6.9/6.9 kv station transformer and dismantling and shifting of existing heil make 50 mva, 400/6.9/6.9 kv station transformer at ctpp, chhabra
Read moreRectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Rectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Read moreCustom bid for services - transportation loading unloading installation extension dismantling and shifting of complete pony belt drivehead belt structure pvcbelt electrical and associated accessories including extension and tail end shifting of belts..
Custom bid for services - transportation loading unloading installation extension dismantling and shifting of complete pony belt drivehead belt structure pvcbelt electrical and associated accessories including extension and tail end shifting of belts..
Read moreSupply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru
Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru
Read moreDismantling, transportation, installation and extension of 1000 mm wide gate belt conveyor along 71lwest from 71 l,/2dip to 43 d of the depillaring panel cmp -5 and pony belt from 19 r/71l to 19r/67l,along with the 1000 mm wide gate belt conveyer
Dismantling, transportation, installation and extension of 1000 mm wide gate belt conveyor along 71lwest from 71 l,/2dip to 43 d of the depillaring panel cmp -5 and pony belt from 19 r/71l to 19r/67l,along with the 1000 mm wide gate belt conveyer
Read moreCollection, preparation, transportation and analysis of feeder coal, mill reject coal, bottom ash and fly ash, pc sample, coal samples from conveyor belts of chp-1 and chp-2, stockyard, collection and preparation of kecm rakes from wagon top at wts and any other special coal samples at rtps
Collection, preparation, transportation and analysis of feeder coal, mill reject coal, bottom ash and fly ash, pc sample, coal samples from conveyor belts of chp-1 and chp-2, stockyard, collection and preparation of kecm rakes from wagon top at wts and any other special coal samples at rtps
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreSupply of conveyor belt for chp and ahp ctpp, rvunl chhabra
Supply of conveyor belt for chp and ahp ctpp, rvunl chhabra
Read moreAnnual contract for conveyor belt jointing, laying, removing work and rubber lagging of conveyor pulleys in ash handling plant of unit 1 to 4, ctpp, chhabra
Annual contract for conveyor belt jointing, laying, removing work and rubber lagging of conveyor pulleys in ash handling plant of unit 1 to 4, ctpp, chhabra
Read moreof your Industry type