Tender Details

Particulars Details
Title
Forged & Annealed Steel Rod Dia 255 (+ / 2) Mm In Multiple Length Of 75 (+ 0/ 5) Mm To Specn 1.2344
Description
Organisation Department of Defence Production | Ministry of Defence
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee
EMD
Tender Value
Place
Link

AAAAAAAAAA

Login to view
Start Date April 25, 2025 18:12
End Date

05/05/2025 ( 9 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Performance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p

Performance based maintenance contract pbmc for maintenance of watul . talgaon section of nh .66 from existing km 332.200 to km 367.200 design km 165.270 to km 198.528 project length 33.258km in the state of maharashtra for 5 years. maintenance p

Read more
Performance based maintenance contracts pbmc estimate of katol to warud section of nh- 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance period

Performance based maintenance contracts pbmc estimate of katol to warud section of nh_ 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance per

Read more
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode

Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode

Read more
Drilling of 175 mm dia and 150 mtr deep tubewell with installation of sumbersible motor pump including electrifcation network at site in gwalior vidhansabha ward 01 to 17 and 31,32,33 and 36 file no. 114/24x9/1

Drilling of 175 mm dia and 150 mtr deep tubewell with installation of sumbersible motor pump including electrifcation network at site in gwalior vidhansabha ward 01 to 17 and 31,32,33 and 36 file no. 114/24x9/1

Read more
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Read more
Performance based maintenance contract pbmc of wadigodri to jalna km 0 000 to 50 264 and ambad chowk to mantha chowk km 0 000 to km 5 243 section of nh 753h project length 55 507 km in the state of maharashtra for 5 year maintenance period

Performance based maintenance contract pbmc of wadigodri to jalna km 0 000 to 50 264 and ambad chowk to mantha chowk km 0 000 to km 5 243 section of nh 753h project length 55 507 km in the state of maharashtra for 5 year maintenance period

Read more
Ss of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state

Ss of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state

Read more
Short term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2

Short term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2

Read more
Short term maintenance to kanaka durga flyover from km 0/000 (269/900) to km 5/122 (275/022) missing link of nh -9 new nh-65 ie connecting nh9 and nh5 in rand b nh division vijayawada in the state of andhra pradesh for the year 2024 25

Short term maintenance to kanaka durga flyover from km 0/000 (269/900) to km 5/122 (275/022) missing link of nh -9 new nh-65 ie connecting nh9 and nh5 in rand b nh division vijayawada in the state of andhra pradesh for the year 2024 25

Read more
Independent engineer services for construction of strr (west side) nh948a obalapura (nelamangala taluk)) to kunigal (ramanagara taluk) from km 0 to km 79 (design chainage) phase-i in karnataka on ham (project length 79 kms)

Independent engineer services for construction of strr (west side) nh948a obalapura (nelamangala taluk)) to kunigal (ramanagara taluk) from km 0 to km 79 (design chainage) phase-i in karnataka on ham (project length 79 kms)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise