Restoration Of Damage Direct Outlet At Rd.116.580 Km Right Side Of Kandi Canal Stage 2.
Description
Restoration Of Damage Direct Outlet At Rd.116.580 Km Right Side Of Kandi Canal Stage 2.
Organisation Government of Punjab
Tender Id 2023_WR_105994_1
Reference
Number
34
Tender Fee 2000
EMD 18278
Tender Value
Place Xen,Kandi Canal Stage2 Division,hoshiarpur
Link https://eproc.punjab.gov.in
Start Date July 20, 2023 22:30
End Date

28/07/2023 ( Expired 681 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst

Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst

Read more
Supply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502.

Supply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502

Read more
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)

Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)

Read more
Rectification of blkspots id no la05-07 at jivetsal to sindhu ghat betn km 463.42-km 463.59 jk02-38 at saboo vill crssng at km 469.45 nd la05-05 at h-colony saboo vill at km 470.316 on manali sarchu leh nh03 rd udr proj hmk in ut of ladakh

Rectification of blkspots id no la05-07 at jivetsal to sindhu ghat betn km 463.42-km 463.59 jk02-38 at saboo vill crssng at km 469.45 nd la05-05 at h-colony saboo vill at km 470.316 on manali sarchu leh nh03 rd udr proj hmk in ut of ladakh

Read more
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Read more
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

Read more
Replacement of steel wire ropes on head and cross regulators installed at km. 6.04 jwalapur on upper ganga canal.

Replacement of steel wire ropes on head and cross regulators installed at km. 6.04 jwalapur on upper ganga canal.&amp#x0d

Read more
Replacement of motors of gates of head and cross regulators installed at km 6.04 jwalapur on upper ganga canal.

Replacement of motors of gates of head and cross regulators installed at km 6.04 jwalapur on upper ganga canal.&amp#x0d

Read more
Work of installing railing and increasing the height of railing on asafnagar head regulator installed at km. 34.630 on upper ganga canal.

Work of installing railing and increasing the height of railing on asafnagar head regulator installed at km. 34.630 on upper ganga canal.&amp#x0d

Read more
Canal water based water supply project for construction of 11.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 2.0 lakh gallon ohsr part-2 at machhiwara sahib town district

Canal water based water supply project for construction of 11.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 2.0 lakh gallon ohsr part-2 at machhiwara sahib town district