Tender Details
Particulars | Details |
---|---|
Title |
Restoration Of Damage Direct Outlet At Rd.116.580 Km Right Side Of Kandi Canal Stage 2.
|
Description |
Restoration Of Damage Direct Outlet At Rd.116.580 Km Right Side Of Kandi Canal Stage 2.
|
Organisation | Government of Punjab |
Tender Id | 2023_WR_105994_1 |
Reference Number |
34 |
Tender Fee | 2000 |
EMD | 18278 |
Tender Value | |
Place | Xen,Kandi Canal Stage2 Division,hoshiarpur |
Link | https://eproc.punjab.gov.in |
Start Date | July 20, 2023 22:30 |
End Date |
28/07/2023 ( Expired 681 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreSupply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502.
Supply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502
Read moreIe services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Read moreRectification of blkspots id no la05-07 at jivetsal to sindhu ghat betn km 463.42-km 463.59 jk02-38 at saboo vill crssng at km 469.45 nd la05-05 at h-colony saboo vill at km 470.316 on manali sarchu leh nh03 rd udr proj hmk in ut of ladakh
Rectification of blkspots id no la05-07 at jivetsal to sindhu ghat betn km 463.42-km 463.59 jk02-38 at saboo vill crssng at km 469.45 nd la05-05 at h-colony saboo vill at km 470.316 on manali sarchu leh nh03 rd udr proj hmk in ut of ladakh
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreReplacement of steel wire ropes on head and cross regulators installed at km. 6.04 jwalapur on upper ganga canal.
Replacement of steel wire ropes on head and cross regulators installed at km. 6.04 jwalapur on upper ganga canal.&#x0d
Read moreReplacement of motors of gates of head and cross regulators installed at km 6.04 jwalapur on upper ganga canal.
Replacement of motors of gates of head and cross regulators installed at km 6.04 jwalapur on upper ganga canal.&#x0d
Read moreWork of installing railing and increasing the height of railing on asafnagar head regulator installed at km. 34.630 on upper ganga canal.
Work of installing railing and increasing the height of railing on asafnagar head regulator installed at km. 34.630 on upper ganga canal.&#x0d
Read moreCanal water based water supply project for construction of 11.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 2.0 lakh gallon ohsr part-2 at machhiwara sahib town district
Canal water based water supply project for construction of 11.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 2.0 lakh gallon ohsr part-2 at machhiwara sahib town district
Read moreof your Industry type