Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Work Of Providing 2 Workers Along With Tractor Trolley Driver In Ward Number 01 To 65 For Garbage Collection And Disposal In The City And Cleaning Of Nandishala And Drain.
|
Description |
Work Of Providing 2 Workers Along With Tractor Trolley Driver In Ward Number 01 To 65 For Garbage Collection And Disposal In The City And Cleaning Of Nandishala And Drain.
|
Organisation | DLB | State Govt. and UT |
Tender Id | 2024_DLB_384506_1 |
Reference Number |
H-1/2024-25 |
Tender Fee | 4000 |
EMD | 7.99 Lakh |
Tender Value | |
Place | MUNICIPAL COUNCIL, SRI GANGANAGAR |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=685178 |
Start Date | February 29, 2024 00:00 |
End Date |
18/03/2024 ( Expired 457 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction of c.c. road and drain work at kailash vihar city center airtel office to income tex office ward no. 30 zone no. 11 file no. 207/25x3/6
Construction of c.c. road and drain work at kailash vihar city center airtel office to income tex office ward no. 30 zone no. 11 file no. 207/25x3/6
Read moreConstruction of road from pmgsy culvert to mohalla badhana ward no. 02, pyt. malhan tehsil surankote district poonch by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick wbm grade-iii 50
Construction of road from pmgsy culvert to mohalla badhana ward no. 02, pyt. malhan tehsil surankote district poonch by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick wbm grade-iii 50
Read moreRepair maint of sewage line septic tank manhole and cleaning work incl repair to drain protective work etc in ms 02 to ms 13 and old cantt under ge gangtok
Repair maint of sewage line septic tank manhole and cleaning work incl repair to drain protective work etc in ms 02 to ms 13 and old cantt under ge gangtok
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreOutsourcing of jobs for mtc. of grassy lawns and open spaces daily cleaning, sweeping and to attend day to day complaints of wood work, electricity, water supply and sanitary and civil works in pc 2 patiala.
Outsourcing of jobs for mtc. of grassy lawns and open spaces daily cleaning, sweeping and to attend day to day complaints of wood work, electricity, water supply and sanitary and civil works in pc 2 patiala.
Read moreConstruction work of rcc u-type drain on both sides for water drainage from amit kumar house to akhlaq house/tarapar farm road in ward no. 01, ambedkar nagar.
Construction work of rcc u-type drain on both sides for water drainage from amit kumar house to akhlaq house/tarapar farm road in ward no. 01, ambedkar nagar.
Read moreUnder the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.
Under the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.
Read moreZone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreof your Industry type