Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ambulance Service For Mtps Ii 240 Days From The Date Of Commencement
|
| Description |
Ambulance Service For Mtps Ii 240 Days From The Date Of Commencement
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_420066_1 |
|
Reference Number |
SE PA MTPSII EE MM AE1 OT No1106 2023 24 |
| Tender Fee | 0 |
| EMD | 2500 |
| Tender Value | - |
| Place | MTPS-II/ Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=499408 |
| Start Date | February 06, 2024 23:00 |
| End Date |
Expired
21/02/2024
Expired 963 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco ytps be1 collection and testing of oil samples pertaining to bm-i division from actual date of commencement of work to 31.03.2027
Tggenco ytps be1 collection and testing of oil samples pertaining to bm-i division from actual date of commencement of work to 31.03.2027
Read moreTggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Read moreCarrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27
Carrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27
Read moreBtps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Read moreCc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Cc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Read moreTggenco - rts-b- providing of insurance coverage for the operational, non-operational and store items and obsolete spares and burglary including theft policy for plant assets of 1x62.5 mw- rts-b unit, ramagundam for a period of one year from the actual date of commencement of insurance coverage
Tggenco - rts-b- providing of insurance coverage for the operational, non-operational and store items and obsolete spares and burglary including theft policy for plant assets of 1x62.5 mw- rts-b unit, ramagundam for a period of one year from the actual date of commencement of insurance coverage
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreTggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Read moreEngaging of jcb in deepthisrinagar bt plant for a pediod of 180 working days in miyapur circle-48, slpzone, cmc
Engaging of jcb in deepthisrinagar bt plant for a pediod of 180 working days in miyapur circle-48, slpzone, cmc
Read moreProviding of temporary decorative series lighting at zonal office building, khairatabad zone, ghmc in view of "bathukamma festival" for three days
Providing of temporary decorative series lighting at zonal office building, khairatabad zone, ghmc in view of "bathukamma festival" for three days
Read moreof your Industry type