Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Annual Contract For Deployment Of Support Manpower In Ash Utilization
|
| Description |
Annual Contract For Deployment Of Support Manpower In Ash Utilization Ahp Fgd Eed And Me Deptt At Ntpc Dadri.
|
| Organisation | NTPC Limited(NTPC) |
| Tender Id | 2023_NTPC_78512_1 |
|
Reference Number |
NTPC/USSC-CPG2/9900263238 |
| Tender Fee | 0 |
| EMD | 2 Lakh |
| Tender Value | 0 |
| Place | Sipat Super Thermal Power Proj |
| Link |
View Original Tender Notice
https://eprocurentpc.nic.in |
| Start Date | August 09, 2023 22:30 |
| End Date |
Expired
18/08/2023
Expired 1151 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of slurry duty dewatering pumps for utilization at various locations of ash water recovery system and zero discharge system
Supply of slurry duty dewatering pumps for utilization at various locations of ash water recovery system and zero discharge system
Read moreSelection of an implementation vendor for design development deployment and manage support of an ai/ml based gst risk analytics platform
Selection of an implementation vendor for design development deployment and manage support of an ai/ml based gst risk analytics platform
Read moreSupply of heaters for esp hoppers, silo and ash handling plant
Supply of heaters for esp hoppers, silo and ash handling plant
Read moreProviding support services for unit-6 generator rectification works
As per tender documents
Read moreCc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Cc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Read moreCeramic fluidizing pads for dry fly ash handling plant of ktps-v stage
Ceramic fluidizing pads for dry fly ash handling plant of ktps-v stage
Read moreSpares for silo vent fan in dry ash handling plant ktps- v stage
Spares for silo vent fan in dry ash handling plant ktps- v stage
Read moreInvitation of proposal for hiring of technical support agency for implementation support for brtp project with regard to health & nutrition under qcbs method (80:20)
Invitation of proposal for hiring of technical support agency for implementation support for brtp project with regard to health & nutrition under qcbs method (80:20)
Read moreSupply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system
Supply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system
Read moreSupply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system
Supply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system
Read moreof your Industry type