Title
Ichp Rewinding And Reinsulation Of 6.6 Kv, 300 Kw, Kirloskar Make Ht Motor Sl.No.3900503 02 By Replacement Of B Phase Stator Winding Consisting Of 20 Coils And Reconditioning The Rotor Shaft Including Transportation Etc.,
Description
Ichp Rewinding And Reinsulation Of 6.6 Kv, 300 Kw, Kirloskar Make Ht Motor Sl.No.3900503 02 By Replacement Of B Phase Stator Winding Consisting Of 20 Coils And Reconditioning The Rotor Shaft Including Transportation Etc.,
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_473807_1
Reference
Number
CE/SE/MI/TTPS/108/2024-2025
Tender Fee 0
EMD 7200
Tender Value
Place TTPS
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=562898
Start Date August 17, 2024 15:30
End Date

02/09/2024 ( Expired 278 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Repairing of 02 nos of 580 kw, 3 phase induction motor 6.6 kv, 1490 rpm (make- marathon electric motors (india) limited) of s.b. project

Repairing of 02 nos of 580 kw, 3 phase induction motor 6.6 kv, 1490 rpm (make- marathon electric motors (india) limited) of s.b. project

Read more
Tn-5401 annual rate contract for 6.6kv vpi and non vpi ht motor rewinding from 175 kw to 4000 kw with new coils of insulation class f and other additional works of stator and rotor at kstps,kota

Annual rate contract for 6.6kv vpi and non vpi ht motor rewinding from 175 kw to 4000 kw with new coils of insulation class f and other additional works of stator and rotor at kstps,kota

Read more
Complete rep./rewinding of (a) stator of 160kw motor, 3 phase, 440v, rpm 1483, make kirloskar, sl.no. 20711009-04 installed at elecon fb no. 02 (b) 15 kw/20 hp motor, local sl. no. dbb/fb/01, make missing for fb water supply pump under dakra ocp

Complete rep./rewinding of (a) stator of 160kw motor, 3 phase, 440v, rpm 1483, make kirloskar, sl.no. 20711009-04 installed at elecon fb no. 02 (b) 15 kw/20 hp motor, local sl. no. dbb/fb/01, make missing for fb water supply pump under dakra ocp

Read more
Complete rewinding of one 150 kva, 6.6 kv 440v lighting transformer one 90kw 550v gec make rotor shaft replacement of jpc

Complete rewinding of one 150 kva, 6.6 kv 440v lighting transformer one 90kw 550v gec make rotor shaft replacement of jpc

Read more
Rewinding, reconditioning and replacements of spares for 850 kw, 6.6 kv, ht motor at peddapur ph-iv, pumping station, replacements spares for existing pumps at ph-iv, peddapur including dismantling, loading, transportation, unloading, erection, testing and commissioning of and ht motor mwss, eam cell-ii, peddapur under td-ii, patancheru

Rewinding, reconditioning and replacements of spares for 850kw, 6.6kv, ht motor at peddapur phase-iv, pumping station, replacements of spares for existing pumps at phase-iv, peddapur including dismantling, loading, transportation, unloading, erection, testing and commissioning of and ht motor under mwss, eam cell-ii, peddapur, transmission division no-ii, patancheru

Read more
Overhauling with replacement of de and nde bearings of vertical solid shaft 6 point 6 kv1505 kw ht motors repairing of ht motor winding terminal lead supply of ht motor bushing insulators etc at tembhu lis pumphouse stage 1a

Overhauling with replacement of de and nde bearings of vertical solid shaft 6 point 6 kv1505 kw ht motors repairing of ht motor winding terminal lead supply of ht motor bushing insulators etc at tembhu lis pumphouse stage 1a

Read more
Rewinding 2nos and overhauling with replacement of de and nde bearings4 nos of vertical solid shaft 6.6kv 1500kw h.tinduction motors, providing and fitting of winding terminal insulator bushings ht fuses etc at tembhu lis pump house stage.3a,3b

Rewinding 2nos and overhauling with replacement of de and nde bearings4 nos of vertical solid shaft 6.6kv 1500kw h.tinduction motors, providing and fitting of winding terminal insulator bushings ht fuses etc at tembhu lis pump house stage.3a,3b

Read more
Complete repairing/rewinding of 05 nos. 900 kw, 6.6 kv, 1492 rpm marathon make ht induction motors of gevra project with sl no. sn- 3f660874/17, 3f660955/6, 3f660682/2, 3f660874/20 and 3f660874/8.

Complete repairing/rewinding of 05 nos. 900 kw, 6.6 kv, 1492 rpm marathon make ht induction motors of gevra project with sl no. sn- 3f660874/17, 3f660955/6, 3f660682/2, 3f660874/20 and 3f660874/8.

Read more
Echp-ii- shifting and replacement of secondary crusher-1b ht motor by the spare motor including transporting of motor and alignment works etc., kirloskar make, 820 kw, 6.6kv, 1483 rpm, sl.no.39008032

Echp-ii- shifting and replacement of secondary crusher-1b ht motor by the spare motor including transporting of motor and alignment works etc., kirloskar make, 820 kw, 6.6kv, 1483 rpm, sl.no.39008032

Read more
Mtps i mill plant unit i rewinding and replacement of rotor shaft of abb make 37 kw seal air fan motor

Mtps i mill plant unit i rewinding and replacement of rotor shaft of abb make 37 kw seal air fan motor

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise