Tender Details

Particulars Details
Title
Pile Foundation Work At Location No 459 Of 400 K V D/C Balipara Bongaigaon (Twin) Transmission Line Under Powergrid Rangia Tlm.
Description
Pile Foundation Work At Location No 459 Of 400 K V D/C Balipara Bongaigaon (Twin) Transmission Line Under Powergrid Rangia Tlm.
Organisation Power Grid Corporation of India Limited
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value -
Place
Link Login to view
Start Date September 10, 2026 15:20
End Date
Open 26/10/2026

11 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Strengthening of existing pile type foundation by open pit foundation for 220kv sultanpur-patti transmission line

Strengthening of existing pile type foundation by open pit foundation for 220kv sultanpur-patti transmission line

Read more
Construction of new tower with pile foundation in place of river eroded tower along at loc-181 of 220kv d/c rangia-salakati line

Construction of new tower with pile foundation in place of river eroded tower along at loc-181 of 220kv d/c rangia-salakati line

Read more
Detailed soil investigation for design of pile foundation at loc-126 of 400 kv d/c balipara-bongaigaon iii and iv quad line and loc-276 of 800 kv bnc-agra hvdc line under balipara tlm.

Detailed soil investigation for design of pile foundation at loc-126 of 400 kv d/c balipara-bongaigaon iii and iv quad line and loc-276 of 800 kv bnc-agra hvdc line under balipara tlm.

Read more
Pile foundation package pl1 400kv d/c talcher (ntpc) - pandiabili (powergrid) transmission line consultancy services to ntpc

Pile foundation package pl1 for construction of 400kv d/c (twin acsr moose) talcher (ntpc) - pandiabili (powergrid) transmission line associated with consultancy services to ntpc

Read more
Erection and stringing towards shifting of tower location no 305 & 458 of 400 kv d/c balipara-bongaigaon (twin) transmission line

Erection and stringing towards shifting of tower location no 305 and 458 of 400 kv d/c balipara-bongaigaon (twin) transmission line

Read more
Implementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b

Implementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b

Read more
Implementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b

Implementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b (neres-xxv part-b)

Read more
Construction of two no. of pile foundations, one normal foundation, tower erection and stringing activities in addition to dismantling and de-string work of required portion of 400kv (tripple snowbird) rajarhat-purnea transmission line at the ganga river crossing, bakia diyara, appx 15km away from pirpenti (bhagalpur) under kahalgaon tlm office of er-i.

Construction of two no. of pile foundations, one normal foundation, tower erection and stringing activities in addition to dismantling and de-string work of required portion of 400kv (tripple snowbird) rajarhat-purnea transmission line at the ganga river crossing, bakia diyara, appx 15km away from pirpenti (bhagalpur) under kahalgaon tlm office of er-i.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise