Tender Details
About Tender
🔋 Tender For Reconditioning Of Transformers Oil At Ttps, Tneb Limited 🔋 Tneb Limited, A State Government Undertaking, Is Seeking Bids For The Reconditioning Of Transformers Oil In All 20 Nos Rectifier Transformers At The Thermal Transmission Project Station (Ttps) During The Overhauling Period Of 2024 25. 📅 Bid Submission Deadline: July 18, 2024, 2:00 Pm A Tender Fee Of Inr 1300 Is Applicable, With No Emd Required. Interested Bidders Should Possess The Necessary Technical Expertise And Infrastructure To Carry Out The Reconditioning Of Transformers Oil As Per The Specified Standards And Within The Stipulated Timeframe. Keywords: Tneb Limited, Transformers Oil Reconditioning, Ttps, Esp I, State Govt. And Ut, Tender, Overhauling Period, 2024 25Particulars | Details |
---|---|
Title |
Ttps Es Em Ii Reconditioning Of Transformers Oil In All 20 Nos Rectifier Transformers In Esp I During The Overhauling Period Of 2024 25
|
Description |
Ttps Es Em Ii Reconditioning Of Transformers Oil In All 20 Nos Rectifier Transformers In Esp I During The Overhauling Period Of 2024 25
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_459674_1 |
Reference Number |
CE/SE/ES /TTPS /No.177/2024-25 |
Tender Fee | 0 |
EMD | 1300 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=546374 |
Start Date | July 03, 2024 21:30 |
End Date |
18/07/2024 ( Expired 300 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Nctps i es circle em i dn s dn i replacement of 6 nos defective 245 kv sf6 breaker pole assembly 3 nos existing 245kv capacitor voltage transformer (cvt) 3 nos existing 245kv current transformer (ct) 3 nos isolators 24nos existing las in 230 k
Nctps i es circle em i dn s dn i replacement of 6 nos defective 245 kv sf6 breaker pole assembly 3 nos existing 245kv capacitor voltage transformer (cvt) 3 nos existing 245kv current transformer (ct) 3 nos isolators 24nos existing las in 230 k
Read moreSupply of wcl security, category ii, listed and listed i for watch and ward services under oil operational area under oil pipeline services in the state of assam for a period of 04 years from 01.07.2025 to 30.06.2029.
Supply of wcl security, category ii, listed and listed i for watch and ward services under oil operational area under oil pipeline services in the state of assam for a period of 04 years from 01.07.2025 to 30.06.2029.
Read moreRepair and maintenance of infrastructure assets in cp division during 2024-25.
Repair and maintenance of infrastructure assets in cp division during 2024-25.&#x0d sh cleaning, sweeping and watch and ward of 07 nos subways for the period of 170 days under c.p. division.&#x0d
Read moreWork of hammering and poking of coal bunker in all three shift during rainy season in unit 1,2,3 and 4 of ph-i n ph-ii at sstpp, mppgcl, dongalia, dist. khandwa
Work of hammering and poking of coal bunker in all three shift during rainy season in unit 1,2,3 and 4 of ph-i n ph-ii at sstpp, mppgcl, dongalia, dist. khandwa
Read moreJob 46.2025 hewp mtc. of all hort. works of shrub plant on central verge 2 4 and 5 in sector 14 p ii and sector 33 p i developed urban forest at u e hisar.
Rough cost estimate for development of urban forest in 5.0 acres area in 100mtr. wide green belt in sector-25, hsvp, hisar. (including one year free mtc. and defect liability period, free of cost).
Read moreJob no. 44.2025 mtc. of all hort. works of tree plants in green belt pocket no. ii sector 25 and stp sector 14 p ii developed under urban forest at u e hisar.
Rough cost estimate for development of urban forest in 5.0 acres area in 100mtr. wide green belt in sector-25, hsvp, hisar. (including one year free mtc. and defect liability period, free of cost).
Read moreJob no. 45.2025 hewp mtc. of all hort. works of shurb plants on central verge no. 1 and 3 in sector 14 p ii and sector 33 p i developed under urban forest at u e hisar.
Rough cost estimate for development of urban forest in 5.0 acres area in 100mtr. wide green belt in sector-25, hsvp, hisar. (including one year free mtc. and defect liability period, free of cost).
Read moreWork of construction commissioning of mla lad sanctioned 10 nos. 200mm diameter tube wells in all strata with supply and installation of submersible pump sets, testing and other allied works with 2 year defect liability period in city subdivision-i/
Work of construction commissioning of mla lad sanctioned 10 nos. 200mm diameter tube wells in all strata with supply and installation of submersible pump sets, testing and other allied works with 2 year defect liability period in city subdivision-i/
Read moreWork of construction commissioning of mla lad sanctioned 10 nos. 200mm diameter tube wells in all strata with supply and installation of submersible pump sets, testing and other allied works with 2 year defect liability period in city subdivision-i
Work of construction commissioning of mla lad sanctioned 10 nos. 200mm diameter tube wells in all strata with supply and installation of submersible pump sets, testing and other allied works with 2 year defect liability period in city subdivision-i
Read moreOverhauling of bhr 95 type kirloskar make v.t.pump no.12 22 25 (3 nos.) atmhaisal stage i pump no. 3 12 (2 nos.) at mhaisal stage ii overhauling of motor no.20 26 at mhaisal satge i and rewinding of motor no.1 at mhaisal stage iii.
Overhauling of bhr 95 type kirloskar make v.t.pump no.12 22 25 (3 nos.) atmhaisal stage i pump no. 3 12 (2 nos.) at mhaisal stage ii overhauling of motor no.20 26 at mhaisal satge i and rewinding of motor no.1 at mhaisal stage iii.
Read moreof your Industry type