Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Civil Works At Stpp Khurja Project Of Thdc At Bulandshahr Uttar Pradesh
|
Description |
Civil Works At Stpp Khurja Project Of Thdc At Bulandshahr Uttar Pradesh
|
Organisation | UP Rajkiya Nirman Nigam Ltd | State Govt. and UT |
Tender Id | 2024_UPRNN_879553_1 |
Reference Number |
2281/NIT/THDC Khurja Works/RNN/2024 dtd 10-01-24 |
Tender Fee | 2360 |
EMD | 1 Lakh |
Tender Value | |
Place | STPP Khurja Bulandshahr |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1517835 |
Start Date | January 26, 2024 22:30 |
End Date |
01/02/2024 ( Expired 505 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor
Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read morePackage iii civil works of water conductor system and power house complex of tato ii hydro electric project
Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep
Read moreConsultancy services for preparation of detailed project report for development of 4lane national highway 128b from ballia (junction on nh31 near teekha) to mau (length 56km) section in uttar pradesh
Consultancy services for preparation of detailed project report for development of 4lane national highway 128b from ballia (junction on nh31 near teekha) to mau (length 56km) section in uttar pradesh
Read moreProvn of additional toilet block and allied works for living in billets at af stn vadodara
Provn of additional toilet block and allied works for living in billets at af stn vadodara
Read moreConstruction of foot over bridge with ramps at km 70800 near jagahedi village of nh709ad in the stretch from shamli to muzaffarnagar pkgii in the state of uttar pradesh
Construction of foot over bridge with ramps at km 70800 near jagahedi village of nh709ad in the stretch from shamli to muzaffarnagar pkgii in the state of uttar pradesh
Read moreConstruction of underpasses at 5 blackspot locations in the project highway at specified locations from ch. 23.600 to ch. 149.900 of nh34 (old nh91) from ghaziabad to aligarh on epc mode in the state of uttar pradesh
Construction of underpasses at 5 blackspot locations in the project highway at specified locations from ch. 23.600 to ch. 149.900 of nh34 (old nh91) from ghaziabad to aligarh on epc mode in the state of uttar pradesh
Read moreCa no. cwe/hills/pgh/20 of 2025-2026 special repair to road and other related works from bld no p32/3 to t point near map p-8/30 and from bld no p-6/01 to p-6/08 and aro complex at 7 e area at mil stn pithoragarh
Ca no. cwe/hills/pgh/20 of 2025-2026 special repair to road and other related works from bld no p32/3 to t point near map p-8/30 and from bld no p-6/01 to p-6/08 and aro complex at 7 e area at mil stn pithoragarh
Read moreSelection of epc contractor for chitrakoot link expressway
Development of access controlled greenfield 4 lane (expandable to 6 lane) chitrakoot link expressway in the state of uttar pradesh on engineering, procurement and construction (epc) mode
Read moreof your Industry type