Tender Details
Particulars | Details |
---|---|
Title |
Improvement To Road From Padsali Paiki Khopicha Dhangarwad Vr 73 Km 0/00 To 2/500,Tal Radhanagari
|
Description |
Improvement To Road From Padsali Paiki Khopicha Dhangarwad Vr 73 Km 0/00 To 2/500,Tal Radhanagari
|
Organisation | Government of Maharashtra |
Tender Id | 2023_PWDRP_934052_2 |
Reference Number |
E Notice No.25 for 2023-2024(IInd call) |
Tender Fee | 600 |
EMD | 40000 |
Tender Value | |
Place | Executive Engineer P.W. (South) Division, Kolhapur |
Link | https://mahatenders.gov.in |
Start Date | August 11, 2023 15:30 |
End Date |
18/08/2023 ( Expired 638 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreConsultancy services for preparation of feasibility report cum detail engineering report for construction of four lane road km. 275-000 to 313-000 of nh 927a ing from near mohan colony chauhara, banswara to danpur upto rajasthan-mp border
Consultancy services for preparation of feasibility report cum detail engineering report for construction of four lane road km. 275-000 to 313-000 of nh 927a ing from near mohan colony chauhara, banswara to danpur upto rajasthan-mp border
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Read moreConsultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Consultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreProviding road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreof your Industry type