Tender Details

Particulars Details
Title
The Work Of Overhead Line Maintenance, Shifting, Realigning Etc On As And When Required Basis During The Period Till Upcoming Monsoons In Kabribab Mine, Giridih Project, Giridih Area (Under Monsoon Action Plan 25)
Description
The Work Of Overhead Line Maintenance, Shifting, Realigning Etc On As And When Required Basis During The Period Till Upcoming Monsoons In Kabribab Mine, Giridih Project, Giridih Area (Under Monsoon Action Plan 25)
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 5900
Tender Value
Place Giridih Area
Link

AAAAAAAAAA

Login to view
Start Date May 06, 2025 14:30
End Date

15/05/2025 ( 6 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
The dismantling and erection of poles for as and when required overhead ht and lt works in the mine lease hold of giridih oc mine until monsoon end period 2025-26, giridih project, giridih area

The dismantling and erection of poles for as and when required overhead ht and lt works in the mine lease hold of giridih oc mine until monsoon end period 2025-26, giridih project, giridih area

Read more
Regular shifting and erection of pipeline at giridh oc mine, giridih project in view of pre and post monsoon as per approved monsoon action plan 2025.

Regular shifting and erection of pipeline at giridh oc mine, giridih project in view of pre and post monsoon as per approved monsoon action plan 2025.

Read more
The work of overhead line maintenance, shifting, realigning etc on as and when required basis during the period till upcoming monsoons in kabribab mine, giridih project, giridih area (under monsoon action plan 25)

The work of overhead line maintenance, shifting, realigning etc on as and when required basis during the period till upcoming monsoons in kabribab mine, giridih project, giridih area (under monsoon action plan 25)

Read more
Annual rate contract for opening and boxing of various end covers / manhole covers, flanges etc. for attending emergent/ breakdown mechanical maintenance jobs of amm-iii plant on as and when required basis for a period of one year

Annual rate contract for opening and boxing of various end covers / manhole covers, flanges etc. for attending emergent/ breakdown mechanical maintenance jobs of amm-iii plant on as and when required basis for a period of one year

Read more
Day-to-day minor running maintenance/ repairing of pipelines, valves, flanges etc. at different locations of surface and mines premises on as and when required basis for a period of one year at dipka expansion project.

Day-to-day minor running maintenance/ repairing of pipelines, valves, flanges etc. at different locations of surface and mines premises on as and when required basis for a period of one year at dipka expansion project.

Read more
Trimming branches and cutting of shrub etc. during monsoon period along the overhead line 11kv,3.3kv,440v of kathara ocp under kathara area.

Trimming branches and cutting of shrub etc. during monsoon period along the overhead line 11kv,3.3kv,440v of kathara ocp under kathara area.

Read more
Shifting of existing 3.3 kv overhead line feeding power to nowrozabad west mine from subsidence area to safe location and maintenance of it in view of coming monsoon 2025-26 of nowrozabad sub area of johilla area

Shifting of existing 3.3 kv overhead line feeding power to nowrozabad west mine from subsidence area to safe location and maintenance of it in view of coming monsoon 2025-26 of nowrozabad sub area of johilla area

Read more
Extension/ erection of lt overhead line (approx. route length for erection/ extension is 1200m and n dismantling of lt line (approx. route length for dismantling is 600 mtr) for a period of six months (180 days) on as when and where required basis

Extension/ erection of lt overhead line (approx. route length for erection/ extension is 1200m and n dismantling of lt line (approx. route length for dismantling is 600 mtr) for a period of six months (180 days) on as when and where required basis

Read more
Shifting of existing 3.3 kv overhead line feeding power to nowrozabad west mine from subsidence area to safe location and maintenance of it in view of coming monsoon 2025-26 of nowrozabad sub area of johilla area

Shifting of existing 3.3 kv overhead line feeding power to nowrozabad west mine from subsidence area to safe location and maintenance of it in view of coming monsoon 2025-26 of nowrozabad sub area of johilla area

Read more
Work of di/extension and dismantling of lt overhead line of eastern part i.e. bramhaputra, 223, bahanpat, bhatora patch, naraibodh patch of mines on as and when required basis for quarry at gevra project for a period of 365 days.

Work of di/extension and dismantling of lt overhead line of eastern part i.e. bramhaputra, 223, bahanpat, bhatora patch, naraibodh patch of mines on as and when required basis for quarry at gevra project for a period of 365 days.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise