Tender Details
Particulars | Details |
---|---|
Title |
The Work Of Overhead Line Maintenance, Shifting, Realigning Etc On As And When Required Basis During The Period Till Upcoming Monsoons In Kabribab Mine, Giridih Project, Giridih Area (Under Monsoon Action Plan 25)
|
Description |
The Work Of Overhead Line Maintenance, Shifting, Realigning Etc On As And When Required Basis During The Period Till Upcoming Monsoons In Kabribab Mine, Giridih Project, Giridih Area (Under Monsoon Action Plan 25)
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 5900 |
Tender Value | |
Place | Giridih Area |
Link |
AAAAAAAAAA Login to view |
Start Date | May 06, 2025 14:30 |
End Date |
15/05/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
The dismantling and erection of poles for as and when required overhead ht and lt works in the mine lease hold of giridih oc mine until monsoon end period 2025-26, giridih project, giridih area
The dismantling and erection of poles for as and when required overhead ht and lt works in the mine lease hold of giridih oc mine until monsoon end period 2025-26, giridih project, giridih area
Read moreRegular shifting and erection of pipeline at giridh oc mine, giridih project in view of pre and post monsoon as per approved monsoon action plan 2025.
Regular shifting and erection of pipeline at giridh oc mine, giridih project in view of pre and post monsoon as per approved monsoon action plan 2025.
Read moreThe work of overhead line maintenance, shifting, realigning etc on as and when required basis during the period till upcoming monsoons in kabribab mine, giridih project, giridih area (under monsoon action plan 25)
The work of overhead line maintenance, shifting, realigning etc on as and when required basis during the period till upcoming monsoons in kabribab mine, giridih project, giridih area (under monsoon action plan 25)
Read moreAnnual rate contract for opening and boxing of various end covers / manhole covers, flanges etc. for attending emergent/ breakdown mechanical maintenance jobs of amm-iii plant on as and when required basis for a period of one year
Annual rate contract for opening and boxing of various end covers / manhole covers, flanges etc. for attending emergent/ breakdown mechanical maintenance jobs of amm-iii plant on as and when required basis for a period of one year
Read moreDay-to-day minor running maintenance/ repairing of pipelines, valves, flanges etc. at different locations of surface and mines premises on as and when required basis for a period of one year at dipka expansion project.
Day-to-day minor running maintenance/ repairing of pipelines, valves, flanges etc. at different locations of surface and mines premises on as and when required basis for a period of one year at dipka expansion project.
Read moreTrimming branches and cutting of shrub etc. during monsoon period along the overhead line 11kv,3.3kv,440v of kathara ocp under kathara area.
Trimming branches and cutting of shrub etc. during monsoon period along the overhead line 11kv,3.3kv,440v of kathara ocp under kathara area.
Read moreShifting of existing 3.3 kv overhead line feeding power to nowrozabad west mine from subsidence area to safe location and maintenance of it in view of coming monsoon 2025-26 of nowrozabad sub area of johilla area
Shifting of existing 3.3 kv overhead line feeding power to nowrozabad west mine from subsidence area to safe location and maintenance of it in view of coming monsoon 2025-26 of nowrozabad sub area of johilla area
Read moreExtension/ erection of lt overhead line (approx. route length for erection/ extension is 1200m and n dismantling of lt line (approx. route length for dismantling is 600 mtr) for a period of six months (180 days) on as when and where required basis
Extension/ erection of lt overhead line (approx. route length for erection/ extension is 1200m and n dismantling of lt line (approx. route length for dismantling is 600 mtr) for a period of six months (180 days) on as when and where required basis
Read moreShifting of existing 3.3 kv overhead line feeding power to nowrozabad west mine from subsidence area to safe location and maintenance of it in view of coming monsoon 2025-26 of nowrozabad sub area of johilla area
Shifting of existing 3.3 kv overhead line feeding power to nowrozabad west mine from subsidence area to safe location and maintenance of it in view of coming monsoon 2025-26 of nowrozabad sub area of johilla area
Read moreWork of di/extension and dismantling of lt overhead line of eastern part i.e. bramhaputra, 223, bahanpat, bhatora patch, naraibodh patch of mines on as and when required basis for quarry at gevra project for a period of 365 days.
Work of di/extension and dismantling of lt overhead line of eastern part i.e. bramhaputra, 223, bahanpat, bhatora patch, naraibodh patch of mines on as and when required basis for quarry at gevra project for a period of 365 days.
Read moreof your Industry type