Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Invitation For Bids: Repair And Maintenance Services For Purnadih Project Buildings 🛠️ Central Coalfields Limited (Cccl), A Public Sector Undertaking, Is Seeking Bids From Reputable Contractors For The Repair And Maintenance Of Buildings Under The Purnadih Project Located In Nk Area. 🏫🏗️ 📅 Bid Submission Deadline: May 15, 2024, 10:00 Am The Project Encompasses The Repair And Maintenance Of The Project Office Building, Personnel Building, Survey Building, And Excavation Building. Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 498,000. Keywords: Repair And Maintenance, Building, Purnadih Project, Central Coalfields Limited, Public Sector Undertaking, Construction Services, Emd| Particulars | Details |
|---|---|
| Title |
Repair And Maintenance Of Project Office Building, Personnel Building Survey Building Excavation Building Under Purnadih Project, Nk Area.
|
| Description |
Repair And Maintenance Of Project Office Building, Personnel Building Survey Building Excavation Building Under Purnadih Project, Nk Area.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_307414_1 |
|
Reference Number |
SO(C)/NK/e-tender/24-25/68 |
| Tender Fee | 0 |
| EMD | 49800 |
| Tender Value | - |
| Place | NK Area. |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=318554 |
| Start Date | May 04, 2024 14:30 |
| End Date |
Expired
15/05/2024
Expired 879 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreSupply, installation, testing, commissioning and demonstration of survey rover receiver and controller with gnss field survey software and accessories, including three years on site warranty and training
Supply, installation, testing, commissioning and demonstration of survey rover receiver and controller with gnss field survey software and accessories, including three years on site warranty and training
Read moreConducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri
Conducting detailed survey including preliminary investigation, net level survey, taking longitudinal sections and cross sections along the alignment and detailed final survey including preparation of designs, drawings and estimates of distributory network including minors or sub-minors or field channels by conducting detailed block level survey for an extent 35,220 acres to identify a minimum net ayacut of 29,937 acres by proposing a ph at pragallapalli village, dummugudem mandal of bhadradri kothagudem district on left bank of sitamma sagar multi purpose project.(2nd call)
Read moreSelection of project management consultant to function as state programme management unit (spmu) for monitoring of naksha pilot project of land records & survey
Selection of project management consultant to function as state programme management unit (spmu) for monitoring of naksha pilot project of land records & survey
Read moreDismanteling of suspension,both side eye repairing by material filling and grinding and fittment of repaired suspension . total of 10 nos suspension for 9 nos running dumpers and 3 nos running water tanker of dakra ocp nk area
Dismanteling of suspension,both side eye repairing by material filling and grinding and fittment of repaired suspension . total of 10 nos suspension for 9 nos running dumpers and 3 nos running water tanker of dakra ocp nk area
Read moreSrlip-distributary package no.5-earthwork excavation, forming of embankment, providing cc lining and construction of cm and cd works of 20r distributary from km.15.500 at karivarigudem village of julurupadu (m) to km.57.285 at gollapalle (v) of laxmidevipalli (m) of bhadradrikothagudem district on main canal of sitarama lift irrigation project.
Srlip-distributary package no.5-earthwork excavation, forming of embankment, providing cc lining and construction of cm and cd works of 20r distributary from km.15.500 at karivarigudem village of julurupadu (m) to km.57.285 at gollapalle (v) of laxmidevipalli (m) of bhadradrikothagudem district on main canal of sitarama lift irrigation project.
Read moreResurvey to demarcate and consolidate forest land boundaries of eight forest blocks of shamirpet range, medchal malkajgiri district, telangana state using modern survey techniques, and development of a gis based decision support database web based gis portal for the said eight forest blocks
Resurvey to demarcate and consolidate forest land boundaries of eight forest blocks of shamirpet range, medchal malkajgiri district, telangana state using modern survey techniques, and development of a gis based decision support database web based gis portal for the said eight forest blocks
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreMnklis phase ii package 3 a) enhancement of capacities of thirumaladevuni tank, laxmipur tank and earlapally tank, b) improvements and strengthening of doultabad tank, husnabad tank, kodangal tank and bomraspet tank, c) earthwork excavation, formation of embankment and lining, including construction of cm and cd works for main canals, distributaries, minors and sub minors of utkoor tank, thirumaladevuni tank, jayamma tank, kanukurthy tank, laxmipur tank, earlapally tank, husnabad tank, kodan
Mnklis phase ii package 3 a) enhancement of capacities of thirumaladevuni tank, laxmipur tank and earlapally tank, b) improvements and strengthening of doultabad tank, husnabad tank, kodangal tank and bomraspet tank, c) earthwork excavation, formation of embankment and lining, including construction of cm and cd works for main canals, distributaries, minors and sub minors of utkoor tank, thirumaladevuni tank, jayamma tank, kanukurthy tank, laxmipur tank, earlapally tank, husnabad tank, kodangal tank, bomraspet tank and gravity canal from kanukurthy tank to bomraspet tank, d) construction of lift iv comprising approach channel, pump house and pressure main at kodangal tank under makthal narayanpet kodangal lift irrigation scheme.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreof your Industry type