Tender Details
Particulars | Details |
---|---|
Title |
Work Of A Masonry Construction Of 110 Nos Of Ventilation Stopping In Proposed Development Panels Mdn N6 A N7 A N8 And S9 And B Replastering Of 30 Nos Ventilation Stopping In Panel N5 In Seam I At Rani Atari Ug Mine
|
Description |
Work Of A Masonry Construction Of 110 Nos Of Ventilation Stopping In Proposed Development Panels Mdn N6 A N7 A N8 And S9 And B Replastering Of 30 Nos Ventilation Stopping In Panel N5 In Seam I At Rani Atari Ug Mine
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 79200 |
Tender Value | |
Place | Rani Atari UG Mine Chirimiri Area SECL |
Link |
AAAAAAAAAA Login to view |
Start Date | April 05, 2025 23:30 |
End Date |
23/04/2025 ( 3 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 30 nos rcc isolation stoppings and 4 nos brick made isolation stopping at 11dip proposed depillaring panel in massan combined seam of shiwani ug mine.
Construction of 30 nos rcc isolation stoppings and 4 nos brick made isolation stopping at 11dip proposed depillaring panel in massan combined seam of shiwani ug mine.
Read moreWork of a masonry construction of 110 nos of ventilation stopping in proposed development panels mdn n6a n7a n8 and s9 and b replastering of 30 nos ventilation stopping in panel n5 in seam i at rani atari ug mine
Work of a masonry construction of 110 nos of ventilation stopping in proposed development panels mdn n6a n7a n8 and s9 and b replastering of 30 nos ventilation stopping in panel n5 in seam i at rani atari ug mine
Read moreShifting of 06 nos. of transformer tsu315kva, 3.3 kv / 570v with all electrical equipments and shifting of main acb, coupled acb for proposed development and depillaring panels at seam vii and vi(b) khairaha ug mine
Shifting of 06 nos. of transformer tsu315kva, 3.3 kv / 570v with all electrical equipments and shifting of main acb, coupled acb for proposed development and depillaring panels at seam vii and vi(b) khairaha ug mine
Read moreConstruction of 52 nos. rcc ventilation stopping in b30, b31 and 3 rise section at seam vi(b) of khairaha u.g. mine
Construction of 52 nos. rcc ventilation stopping in b30, b31 and 3 rise section at seam vi(b) of khairaha u.g. mine
Read moreConstruction of 19 (nineteen) nos. rcc isolation stopping for sealing of p-9b and p-9c proposed depillaring panel in l.k.ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Construction of 19 (nineteen) nos. rcc isolation stopping for sealing of p-9b and p-9c proposed depillaring panel in l.k.ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Read moreConstruction of 15 nos ventilation stopping by brick from 0d to 10ed in between 33l and 34l and 34l to 37l in between 10ed and 11ed of proposed panel e2 bott dep stow district in working of rvi chora seam for chora 7 and 9 pit colliery under kenda ar
Construction of 15 nos ventilation stopping by brick from 0d to 10ed in between 33l and 34l and 34l to 37l in between 10ed and 11ed of proposed panel e2 bott dep stow district in working of rvi chora seam for chora 7 and 9 pit colliery under kenda ar
Read moreConstruction of 72 nos. ventilation stoppings by use of fly ash brick in c.m. panel 37la, 34d, 39d, 34r and 40r dev. district of 10b seam at haldibari ug mine
Construction of 72 nos. ventilation stoppings by use of fly ash brick in c.m. panel 37la, 34d, 39d, 34r and 40r dev. district of 10b seam at haldibari ug mine
Read moreConstruction of 95 nos ventilation stoppings in a 21 nos in sump area in seam no.v b 16 nos in 30n 45e dev panel in seam no.-v c 04 nos in 58e 15s dev panel in seam no. iv d 35 nos in 63e 15s dev panel in seam no.iv and e 19 nos in 75w 15s
Construction of 95 nos ventilation stoppings in a 21 nos in sump area in seam no.v b 16 nos in 30n 45e dev panel in seam no.-v c 04 nos in 58e 15s dev panel in seam no. iv d 35 nos in 63e 15s dev panel in seam no.iv and e 19 nos in 75w 15s dev. panel
Read moreConstruction of 08 (eight) nos. ventilation stopping to establish ventilation circuit for proposed 04d/29l dev. dist. in kenda (r-vi) seam of bansra colliery under kunustoria area
Construction of 08 (eight) nos. ventilation stopping to establish ventilation circuit for proposed 04d/29l dev. dist. in kenda (r-vi) seam of bansra colliery under kunustoria area
Read moreInstallation of gate belt (1000mm) for proposed development/dep. panel cm 6 and cm 7 (vii seam)at bangwar ug mine, sgp area
Installation of gate belt (1000mm) for proposed development/dep. panel cm 6 and cm 7 (vii seam)at bangwar ug mine, sgp area
Read moreof your Industry type