Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Earthwork In Cutting/Formation , Extension Of Minor Bridges, Supply Of Stone Ballast Of 65 Mm Size(hard Stone), Transportation Of P. Way Material, Laying &Amp Linking Of Bg Track Including Point Xing, Dismantling Of Civil Structures And Other Miscellaneous Works In C/W Converting Stabling Line No. 9 Into Running Line And A Passenger Pf Line At Udaipur Station
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 77872573 |
|
Reference Number |
GSU-AII-UDZLL910-24-25 |
| Tender Fee | 0 |
| EMD | 2.16 Lakh |
| Tender Value | - |
| Place | Jaipur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/112024/77872573/viewNitPdf_4738081.pdf |
| Start Date | October 17, 2024 18:42 |
| End Date |
Expired
08/11/2024
Expired 707 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
P.way ( track) linking work on railway formation along with linking to existing line at tangarbansali yard including supply of ballast at tangarbansali of ranchi divsion.
P.way ( track) linking work on railway formation along with linking to existing line at tangarbansali yard including supply of ballast at tangarbansali of ranchi divsion.
Read moreExecution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
Execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
Read moreConstruction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Read moreConstruction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Read moreConstruction of new bg double line from kharsia (km 0.00) to balodabazar (km 110.500) and y-connectivity from jharadih including earthwork in formation, bridges, ror (rail over rail), rob (road over bridge), rub (road under bridge), service buildings, staff quarters, p-way works (including supply of ballast, p-way material exept rail), electrification (2x25 kv ohe, psi, plc & electrical general work), and signalling & telecommunication works, along with allied and associated miscellan
Construction of new bg double line from kharsia (km 0.00) to balodabazar (km 110.500) and y-connectivity from jharadih including earthwork in formation, bridges, ror (rail over rail), rob (road over bridge), rub (road under bridge), service buildings, staff quarters, p-way works (including supply of ballast, p-way material exept rail), electrification (2x25 kv ohe, psi, plc & electrical general work), and signalling & telecommunication works, along with allied and associated miscellan
Read moreJeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl
Jeypore - nabarangpur new bg railway line project: design & construction of new bg railway line between ambaguda(excluding) (13.60 km) to nabarangpur(including) (43.996km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding bridge no. 85 at km. 37.080 i.e. indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material suppl
Read moreManufacturing and supplying of 50 mm size of pakur variety hard machine crushed stone ballast of approved quality from quarry pakur/ talijhari/ bakudi/ sahibganj/ pinergaria for the section from molvom (mlvm) yard to pherima (perm) yard and upto km 44/5 of dimapur (dhansiri) - kohima (zubza) bg new line project of n.f. railway construction organization.
Manufacturing and supplying of 50 mm size of pakur variety hard machine crushed stone ballast of approved quality from quarry pakur/ talijhari/ bakudi/ sahibganj/ pinergaria for the section from molvom (mlvm) yard to pherima (perm) yard and upto km 44/5 of dimapur (dhansiri) - kohima (zubza) bg new line project of n.f. railway construction organization.
Read moreShoranur-mangaluru section: (1) proposed re-construction of br. no. 904 (proposed dn line) at km 636/100-300 as 5 x 18.0m effective span psc i girder & slab and 1 x 6.1m clear span psc slab between tanur & parappanangadi stations (2) proposed reconstruction of br. no. 1085 (proposed up line) at km 735/000-200 as 3 x 18m effective span psc i girder & slab between thalassery & etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast
Shoranur-mangaluru section: (1) proposed re-construction of br. no. 904 (proposed dn line) at km 636/100-300 as 5 x 18.0m effective span psc i girder & slab and 1 x 6.1m clear span psc slab between tanur & parappanangadi stations (2) proposed reconstruction of br. no. 1085 (proposed up line) at km 735/000-200 as 3 x 18m effective span psc i girder & slab between thalassery & etakkot stations including earthwork & blanketing for formation on approaches, collection of ballast
Read moreConstruction of platforms, earthwork/ blanketing in formation/cutting, retaining wall & drain, rub, fob, minor bridge (br.no.466/2, 467/1, 467/2, 467/3, 467/4, 467/4, 468/1, 468/2, 469/1), station building(g+1) and station building compound wall, water tank, toilet, rub pump house, road, etc. work and dismantling and track works for nimbhora yard remodelling, including ballast supply in connection with bsl-knw 3rd and 4th line (131km) project of central railway. (two packet system).
Construction of platforms, earthwork/ blanketing in formation/cutting, retaining wall & drain, rub, fob, minor bridge (br.no.466/2, 467/1, 467/2, 467/3, 467/4, 467/4, 468/1, 468/2, 469/1), station building(g+1) and station building compound wall, water tank, toilet, rub pump house, road, etc. work and dismantling and track works for nimbhora yard remodelling, including ballast supply in connection with bsl-knw 3rd and 4th line (131km) project of central railway. (two packet system).
Read moreStrengthening of substructure and replacement of existing fish bellied plate girders upto 12.20m span of major bridges br. no 736up (4x12.2m) at km:554/0-2,balance work of br no.750up (10x12.2m) at km:564/8-9, br no.792up (9x12.2m) at km:597/0-1, br no.823up (2x12.2m) at km:621/9-622/0, br.no.848up (2x12.2m) atkm:639/5-6 by post tensioned psc slabs, lifting/linking of track, supply of ballast, earthwork, blanketing work and other ancillary work as per 25t loading standard in the jurisdiction o
Strengthening of substructure and replacement of existing fish bellied plate girders upto 12.20m span of major bridges br. no 736up (4x12.2m) at km:554/0-2,balance work of br no.750up (10x12.2m) at km:564/8-9, br no.792up (9x12.2m) at km:597/0-1, br no.823up (2x12.2m) at km:621/9-622/0, br.no.848up (2x12.2m) atkm:639/5-6 by post tensioned psc slabs, lifting/linking of track, supply of ballast, earthwork, blanketing work and other ancillary work as per 25t loading standard in the jurisdiction o
Read moreof your Industry type