Tender Details

Particulars Details
Title
Internal Clearance Of Weed Growth, Uprooting Jungle From Rd. 0 To 10000 Of Nizampur Adbar Cunnettee Before Monsoon Season 2025
Description
Internal Clearance Of Weed Growth, Uprooting Jungle From Rd. 0 To 10000 Of Nizampur Adbar Cunnettee Before Monsoon Season 2025
Organisation Haryana Government | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 1680
EMD 1080
Tender Value
Place ADBAR
Link

AAAAAAAAAA

Login to view
Start Date April 21, 2025 19:40
End Date

28/04/2025 ( 6 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
One time clearance of water hyacinth, jungle and deposition in canal bed from raiganj bus stand up to south birnagar ankush club at ward no-21 and 23 under raiganj municipality

One time clearance of water hyacinth, jungle and deposition in canal bed from raiganj bus stand up to south birnagar ankush club at ward no-21 and 23 under raiganj municipality

Read more
Cs for prep of dpr and providing pre constr activities for constr of rd nurbo sumdo kiato to nhdl spec for 75 km length from km 0 to km 75 incl two dimensional 5 km tunnel incl detail feasibility study for tunnel at talking la pass under p dpk in hp

Cs for prep of dpr and providing pre constr activities for constr of rd nurbo sumdo kiato to nhdl spec for 75 km length from km 0 to km 75 incl two dimensional 5 km tunnel incl detail feasibility study for tunnel at talking la pass under p dpk in hp

Read more
Removal and clearance of weed growth, shurbs, and jungle bushes along bcw complex area at baggi and distempering and painting of baggi rest camp building along with fabrication of steel platform for old for old emergency gate at bcw complex bbmb sund

Removal and clearance of weed growth, shurbs, and jungle bushes along bcw complex area at baggi and distempering and painting of baggi rest camp building along with fabrication of steel platform for old for old emergency gate at bcw complex bbmb sund

Read more
Removal of weed growth, shrubs, jungle, bushes etc. from slopes, dowels, embankments of sundernagar hydel channel along with providing and painting of various structure bbmb sundernagar

Removal of weed growth, shrubs, jungle, bushes etc. from slopes, dowels, embankments of sundernagar hydel channel along with providing and painting of various structure bbmb sundernagar

Read more
Strengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore - villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu

Strengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu

Read more
Improvement of amarpur rd block road from gate no-1 to gate no-2 (l-0.450 km) under amarpur rd block during the year 2025-26.sh- widening, gsb,wbm-ii, wbm-iii, pmc(paver machine) and road marking and furniture etc

Improvement of amarpur rd block road from gate no-1 to gate no-2 (l-0.450 km) under amarpur rd block during the year 2025-26.sh- widening, gsb,wbm-ii, wbm-iii, pmc(paver machine) and road marking and furniture etc

Read more
Internal clearance of gurguria nallah from rd 2800 to 0 before flood season 2025

Internal clearance of gurguria nallah from rd 2800 to 0 before flood season 2025. (the tender is open for contractors/agencies/societies)

Read more
Internal clearance of baknour area drain from rd 7000 to 0 before flood season 2025

Internal clearance of baknour area drain from rd 7000 to 0 before flood season 2025. (the tender is open for contractors/agencies/societies)

Read more
Internal clearance of chourmastpur drain from rd 7700 to 0 before flood season 2025

Internal clearance of chourmastpur drain from rd 7700 to 0 before flood season 2025. (the tender is open for contractors/agencies/societies)

Read more
Fdr_ restoration of bijoy river bank at different stretches under bishalgarh rd block during the year 2025-26_ sh_ advance procurement of flood fighting materials for upcomming monsoon season under wr sub-division bishalgarh.

Fdr_ restoration of bijoy river bank at different stretches under bishalgarh rd block during the year 2025-26_ sh_ advance procurement of flood fighting materials for upcomming monsoon season under wr sub-division bishalgarh.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise