Tender Details
Particulars | Details |
---|---|
Title |
Internal Clearance Of Weed Growth, Uprooting Jungle From Rd. 0 To 10000 Of Nizampur Adbar Cunnettee Before Monsoon Season 2025
|
Description |
Internal Clearance Of Weed Growth, Uprooting Jungle From Rd. 0 To 10000 Of Nizampur Adbar Cunnettee Before Monsoon Season 2025
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1680 |
EMD | 1080 |
Tender Value | |
Place | ADBAR |
Link |
AAAAAAAAAA Login to view |
Start Date | April 21, 2025 19:40 |
End Date |
28/04/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
One time clearance of water hyacinth, jungle and deposition in canal bed from raiganj bus stand up to south birnagar ankush club at ward no-21 and 23 under raiganj municipality
One time clearance of water hyacinth, jungle and deposition in canal bed from raiganj bus stand up to south birnagar ankush club at ward no-21 and 23 under raiganj municipality
Read moreCs for prep of dpr and providing pre constr activities for constr of rd nurbo sumdo kiato to nhdl spec for 75 km length from km 0 to km 75 incl two dimensional 5 km tunnel incl detail feasibility study for tunnel at talking la pass under p dpk in hp
Cs for prep of dpr and providing pre constr activities for constr of rd nurbo sumdo kiato to nhdl spec for 75 km length from km 0 to km 75 incl two dimensional 5 km tunnel incl detail feasibility study for tunnel at talking la pass under p dpk in hp
Read moreRemoval and clearance of weed growth, shurbs, and jungle bushes along bcw complex area at baggi and distempering and painting of baggi rest camp building along with fabrication of steel platform for old for old emergency gate at bcw complex bbmb sund
Removal and clearance of weed growth, shurbs, and jungle bushes along bcw complex area at baggi and distempering and painting of baggi rest camp building along with fabrication of steel platform for old for old emergency gate at bcw complex bbmb sund
Read moreRemoval of weed growth, shrubs, jungle, bushes etc. from slopes, dowels, embankments of sundernagar hydel channel along with providing and painting of various structure bbmb sundernagar
Removal of weed growth, shrubs, jungle, bushes etc. from slopes, dowels, embankments of sundernagar hydel channel along with providing and painting of various structure bbmb sundernagar
Read moreStrengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore - villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu
Strengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu
Read moreImprovement of amarpur rd block road from gate no-1 to gate no-2 (l-0.450 km) under amarpur rd block during the year 2025-26.sh- widening, gsb,wbm-ii, wbm-iii, pmc(paver machine) and road marking and furniture etc
Improvement of amarpur rd block road from gate no-1 to gate no-2 (l-0.450 km) under amarpur rd block during the year 2025-26.sh- widening, gsb,wbm-ii, wbm-iii, pmc(paver machine) and road marking and furniture etc
Read moreInternal clearance of gurguria nallah from rd 2800 to 0 before flood season 2025
Internal clearance of gurguria nallah from rd 2800 to 0 before flood season 2025. (the tender is open for contractors/agencies/societies)
Read moreInternal clearance of baknour area drain from rd 7000 to 0 before flood season 2025
Internal clearance of baknour area drain from rd 7000 to 0 before flood season 2025. (the tender is open for contractors/agencies/societies)
Read moreInternal clearance of chourmastpur drain from rd 7700 to 0 before flood season 2025
Internal clearance of chourmastpur drain from rd 7700 to 0 before flood season 2025. (the tender is open for contractors/agencies/societies)
Read moreFdr_ restoration of bijoy river bank at different stretches under bishalgarh rd block during the year 2025-26_ sh_ advance procurement of flood fighting materials for upcomming monsoon season under wr sub-division bishalgarh.
Fdr_ restoration of bijoy river bank at different stretches under bishalgarh rd block during the year 2025-26_ sh_ advance procurement of flood fighting materials for upcomming monsoon season under wr sub-division bishalgarh.
Read moreof your Industry type