Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fabrication, Supply, Installation And Testing Of Transmitter Racks With Transmitters, Field Instruments And Associated Ss Tubing, Cabling And Termination For Hlw Partitioning Facility At North Bay Of Wip, Kalpakkam
|
| Description |
Fabrication, Supply, Installation And Testing Of Transmitter Racks With Transmitters, Field Instruments And Associated Ss Tubing, Cabling And Termination For Hlw Partitioning Facility At North Bay Of Wip, Kalpakkam
|
| Organisation | Bhabha Atomic Research Centre | Central Govt. Ministry/Department |
| Tender Id | 2025_BARC_863767_1 |
|
Reference Number |
BARCF/IN-M-EEI/WE/TR/17/2025 |
| Tender Fee | 0 |
| EMD | 5.25 Lakh |
| Tender Value | |
| Place | Kalpakkam |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=908116 |
| Start Date | June 19, 2025 16:30 |
| End Date |
Expired
12/07/2025
Expired 327 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply, installation, testing, and commissioning of boom barrier system, anpr and driver face recognition system along with associated electrical and civil works.
Supply, installation, testing, and commissioning of boom barrier system, anpr and driver face recognition system along with associated electrical and civil works.
Read moreE-tender for supply, installation, testing and commissioning of high-pressure homogenizer at centre for advanced bio process equipment facility at ticel phase-iii coimbatore
Supply, installation, testing and commissioning of high-pressure homogenizer at centre for advanced bio process equipment facility
Read moreSurvey,design, fabrication,supply, installation,testing and commissioning of 17kw grid connected solar plant with net metering and 06 n0 solar street lights at rural self employment training institute, babupeth of district chandrapur with 5years cmc
Survey,design, fabrication,supply, installation,testing and commissioning of 17kw grid connected solar plant with net metering and 06 n0 solar street lights at rural self employment training institute, babupeth of district chandrapur with 5years cmc
Read moreSelection of firm/company for supply, installation, testing and commissioning of mrf (material recovery facility) machines at various mrf centers within lucknow municipal corporation area as per specifications.
Selection of firm/company for supply, installation, testing and commissioning of mrf (material recovery facility) machines at various mrf centers within lucknow municipal corporation area as per specifications.
Read moreSurvey, design, fabrication, supply, installation, testing and commissioning of total 27.32 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years
Survey, design, fabrication, supply, installation, testing and commissioning of total 27.32 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years
Read moreSurvey design fabrication supply installation testing and commissioning of total 12.60 kw of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 05 years
Survey design fabrication supply installation testing and commissioning of total 12.60 kw of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 05 years at krushibeej farmer producer company ltt
Read moreDesign manufacture supply installation testing and commissioning of heavyduty machine room less and gearless lifts and heavy duty escalators along with two years dlp followed by three years of camc for indore metro rail project
Design manufacture supply installation testing and commissioning of heavyduty machine room less and gearless lifts and heavy duty escalators along with two years dlp followed by three years of camc for indore metro rail project
Read moreSupply, installation, testing and commissioning of ht (11 kv) metering cubicles with tod meter, ht tod meter and ht bi-directional tod meter suitable for 250 kva (11 kv/433 v) transformers to the lakshadweep electricity department
Supply, installation, testing and commissioning of ht (11 kv) metering cubicles with tod meter, ht tod meter and ht bi-directional tod meter suitable for 250 kva (11 kv/433 v) transformers to the lakshadweep electricity department
Read moreSupply, installation, testing and commissioning of field instruments for advanced hlw treatment facility at wip, kalpakkam
Supply, installation, testing and commissioning of field instruments for advanced hlw treatment facility at wip, kalpakkam
Read moreFabrication and installation of ss tanks along with ss and cs piping for pcw and scw systems for north hlw including supply and installation of various capacity centrifugal pumps for ccim and north hlw system at wip, kalpakkam
Fabrication and installation of ss tanks along with ss and cs piping for pcw and scw systems for north hlw including supply and installation of various capacity centrifugal pumps for ccim and north hlw system at wip, kalpakkam
Read moreof your Industry type