Tender Details
Particulars | Details |
---|---|
Title |
Removing Of Existing Rumble Strips And Replacing It With Transverse Bar Markings (As Per Latest Irc Specifications) From Km.570/00 To Km.611/00 Along Nh 66.
|
Description |
Removing Of Existing Rumble Strips And Replacing It With Transverse Bar Markings (As Per Latest Irc Specifications) From Km.570/00 To Km.611/00 Along Nh 66.
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id | 2024_PWD_15166_1 |
Reference Number |
13/1/2023 24/PWD/WDXIV/NH/ASW/43 Line 2 |
Tender Fee | 9303 |
EMD | 53025 |
Tender Value | |
Place | Km.570/00 to Km.611/00 along NH-66. |
Link | https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=15444 |
Start Date | March 14, 2024 16:35 |
End Date |
20/03/2024 ( Expired 398 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Renovation and modification of existing post wagon tripler railway track at fly ash siding to use it as fly ash line no.2 along with construction of washing apron and rcc drain at stps/wbpdcl
Renovation and modification of existing post wagon tripler railway track at fly ash siding to use it as fly ash line no.2 along with construction of washing apron and rcc drain at stps/wbpdcl
Read moreRepair and restoration of existing streetlight along the nh-2e belghoria expressway from km.0.000 to km.7.363 excluding from km.2.900 to 4.250 under north 24 parganas district in the state of west bengal
Repair and restoration of existing streetlight along the nh-2e belghoria expressway from km.0.000 to km.7.363 excluding from km.2.900 to 4.250 under north 24 parganas district in the state of west bengal
Read moreRehabilitation and up-gradation from single lane to two lane with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode
Rehabilitation and up-gradation from single lane to two lane with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode
Read moreRfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Read moreUpgradation and construction of multai to mh border road section of nh-347a from design chainage 0.000 to 23.94 km (total length 23.94 km) to 2l with paved shoulder configuration along with one time improvement in 5.80 km length in the state of made
Upgradation and construction of multai to mh border road section of nh-347a from design chainage 0.000 to 23.94 km (total length 23.94 km) to 2l with paved shoulder configuration along with one time improvement in 5.80 km length in the state of made
Read moreSupply, installation and commissioning of addl. illumination and major maintenance of existing illumination including integration with iot from km 28.000 to km 121.000 on tambaram to tindivanam section of nh-32
Supply, installation, and commissioning of additional 
 illumination and major maintenance of existing illumination, 
 including integration with iot from km 28.000 to km 
 121.000 on tambaram to tindivanam section of nh-32
Read moreHiring of 10 no safai karamchari and three small pickup with lifting and compartmentalized system along with driver for door to door garbage collection through contractors/firm/society/ ngo mc bilaspur from ward no 7-11 as per directionofmc bilaspur
Hiring of 10 no safai karamchari and three small pickup with lifting and compartmentalized system along with driver for door to door garbage collection through contractors/firm/society/ ngo mc bilaspur from ward no 7-11 as per direction ofmc bilaspu
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreReestablishment of sevugampatti toll plaza at km 27.900 with installation of etc equipment and the maintenance of existing etc equipment along with the engagement of system integrator in dindigul to theni sec of nh183 in the state of tn
Re establishment of sevugampatti toll plaza at km 27 900 with installation of etc equipment and the maintenance of existing etc equipment along with the engagement of system integrator in dindigul to theni sec of nh 183 in the state of tn
Read moreConsultancy services for preparation of dpr for 4 laning of project from existing two lane with paved shoulders of krishnagiri - tindivanam section of nh-77 (old nh-66) from km 0.000 to km 182.182 (length 182.182 km) in the state of tamil nadu2ndcall
Consultancy services for preparation of dpr for 4 laning of project from existing two lane with paved shoulders of krishnagiri - tindivanam section of nh-77 (old nh-66) from km 0.000 to km 182.182 (length 182.182 km) in the state of tamil nadu2ndcall
Read moreof your Industry type