Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Elevator For 2 X800 Mw Ntpc Lara Tpp Stage Ii Epc
|
Description |
Elevator For 2 X800 Mw Ntpc Lara Tpp Stage Ii Epc
|
Organisation | Bharat Heavy Electricals Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | 2X800 MW NTPC LARA TPP STAGE II EPC |
Link |
AAAAAAAAAA Login to view |
Start Date | June 17, 2025 23:30 |
End Date |
27/06/2025 ( 5 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project
Lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project, baramulla district of ut of j and k, india
Read moreBop package for gadarwara stpp-ii
Bop package for gadarwara super thermal power project stage-ii (2x800 mw)
Read moreDevelopment of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Read moreProcurement of power and control cables for stage-i and ii of chp.
Procurement of power and control cables for stage-i and ii of chp. total quantity as per nit.
Read moreProcurement of spares for cctv system installed at 2x660 mw, sstpp, mppgcl, dongalia/etni-ii
Procurement of spares for cctv system installed at 2x660 mw, sstpp, mppgcl, dongalia
Read moreProcurement of conveyor belt for mill reject system of stage-ii and iii units installed at ggsstp
Procurement of conveyor belt for mill reject system of stage-ii and iii units installed at ggsstp ropar
Read moreAssistance in breakdown prive maintenance and annual overhauling of fsss and sadc systems for ggsstp stage-ii and iii units.
Assistance in breakdown prive maintenance and annual overhauling of fsss and sadc systems for ggsstp stage-ii and iii units.
Read moreProcurement of spares for dm plants stage-ii and iii at ggsstp ropar
Procurement of spares for dm plants stage-ii and iii at ggsstp ropar
Read moreLot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir
Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india
Read moreAll risk comprehensive package mega risk policy including terrorism and third party liability policy for jkspdc 900 mw baglihar power station (stage i and ii), chanderkote, district ramban, jammu and kashmir
All risk comprehensive package mega risk policy including terrorism and third party liability policy for jkspdc 900 mw baglihar power station (stage i and ii), chanderkote, district ramban, jammu and kashmir
Read moreof your Industry type