Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing And Fixing Railing For Extension Of Iron Grill Between Railway Light Point Upto Ut Boundary Kalka Road Including Old Railing 9 10 Long Refixing After Reparing Strengthening On Kalka Road Chandigarh
|
| Description |
Providing And Fixing Railing For Extension Of Iron Grill Between Railway Light Point Upto Ut Boundary Kalka Road Including Old Railing 9 10 Long Refixing After Reparing Strengthening On Kalka Road Chandigarh
|
| Organisation | Chandigarh Administration | State Govt. and UT |
| Tender Id | 2025_CHD_84853_1 |
|
Reference Number |
CP2Road1993187 |
| Tender Fee | 0 |
| EMD | 3.61 Lakh |
| Tender Value | - |
| Place | Chandigarh |
| Link |
View Original Tender Notice
https://etenders.chd.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=104254 |
| Start Date | February 26, 2025 00:20 |
| End Date |
Expired
05/03/2025
Expired 586 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Provn of iron grill, railing, parking shed and tiles incl certain sanction work at af stn bihta.
Provn of iron grill, railing, parking shed and tiles incl certain sanction work at af stn bihta.
Read moreRemoving and refixing of ornamental railing pipe railing before and after rains includingtransportation from bridge to store and security in rainy season and repairing and maintance of submersible bridge railing etc of pwd setu sub division ujjain
Removing and refixing of ornamental railing pipe railing before and after rains includingtransportation from bridge to store and security in rainy season and repairing and maintance of submersible bridge railing etc of pwd setu sub division ujjain
Read moreBalance work of lane and iron grill on drian from h/o mohd yousuf lone upto h/o zubair ahmad shah at alyalpora ward no 02
Balance work of lane and iron grill on drian from h/o mohd yousuf lone upto h/o zubair ahmad shah at alyalpora ward no 02
Read moreGeneral-mp-rbc-ap- 2023-24-urgent rectification of thenur branch canal-and fixation of iron grill between ch 2/000 to 2/100 km-general civil work
This work has been proposed in b/w ch 2/000&#x0d km to 2/100 km of thenur branch canal
Read moreProvision of railing around lawn between opd entrance and omfed booth, repairing of main gates near academic block and substation, repairing and addition of extra bars in existing grill in front boundary wall of aiims, bhubaneswar
Provision of railing around lawn between opd entrance and omfed booth, repairing of main gates near academic block and substation, repairing and addition of extra bars in existing grill in front boundary wall of aiims, bhubaneswar
Read moreLand protection work in trans yamuna area(ez). sh - providing and fixing fencing/railing along the road/bridge/river with rcc post, concertina coil and ms grill at yamuna vatika in yamuna flood plain (old iron bridge to ito barrage-).
Land protection work in trans yamuna area(ez). sh - providing and fixing fencing/railing along the road/bridge/river with rcc post, concertina coil and ms grill at yamuna vatika in yamuna flood plain (old iron bridge to ito barrage-).
Read moreMaking a new porta cabin and modification in existing porta cabins by making s and front wall iron grill by welding steel bars in between large gaps for security purpose at sonipat campus of iit delhi
Making a new porta cabin and modification in existing porta cabins by making s and front wall iron grill by welding steel bars in between large gaps for security purpose at sonipat campus of iit delhi
Read moreGrassing ground between house no. d-11 to d-20 and d-21 to d-30 and providing and fixing of steel railing made of m.s. angle iron in the ram leela ground, sector 14, panjab university, chandigarh
Grassing ground between house no. d-11 to d-20 and d-21 to d-30 and providing and fixing of steel railing made of m.s. angle iron in the ram leela ground, sector 14, panjab university, chandigarh
Read moreInstallation of one no 900gpm, 90m head turbine pump at 5d between 19l and 20l after transporting from surface, installation of one no 500mtr long(approx) 6 in pipeline and make necessary fabrication for matching this line to pump and existing delive
Installation of one no 900gpm, 90m head turbine pump at 5d between 19l and 20l after transporting from surface, installation of one no 500mtr long(approx) 6 in pipeline and make necessary fabrication for matching this line to pump and existing delive
Read moreInstallation of two no 500 gpm 240m head turbine pump at 10l between 0d and 1d after transporting from surface 3d 18l and installation of 2 nos 252m long 6 in pipeline and make necessary fabrication from 0d 10l to 1d 4l boreholes at mic jpc
Installation of two no 500 gpm 240m head turbine pump at 10l between 0d and 1d after transporting from surface 3d 18l and installation of 2 nos 252m long 6 in pipeline and make necessary fabrication from 0d 10l to 1d 4l boreholes at mic jpc
Read moreof your Industry type